BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 17, 2021 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Concord, Ontario. Completed plans call for site work for a water / sewer project.

Question Deadline: Mon Jun 14, 2021 3:00:00 PM (EDT) The scope of work under this Contract includes 2,700m of 450mm CPP watermain replacement along Keele Street installed primarily by open-cut methods. The replacement also includes two portions of horizontal directional drilling (HDD) using 550mm OD HDPE at the Keele Street and Highway 7 intersection (105m) and at the Keele Street and Rivermede Road intersection (60m). The scope of work also includes the replacement of the watermain on Highway 7

Award

Water / Sewer

$9,632,576.00

Public - City

Site Work

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
477
Active Projects
194
Bidding Soon
4,872
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2021

July 19, 2021

Project location map

Keele St & Rivermede Rd, Concord, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.