Published March 7, 2022 at 7:00 PM

Updated September 15, 2023

Renovation of a civil project in Wylie, Texas. Completed plans call for the renovation of a water / sewer project.

In order to participate, all venders must first register as a potential supplier with MWH. To register as a potential vender, please contact Ashlyn Couture via the general project email at WylieWTP@mwhconstructors.com. Once registered, and upon the commencement of the bid solicitation period, all eligible companies will be provided digital access to all relevant scope packages, project documents and related schedules. Project No. 517, Wylie WTP Plant II Structural and Mechanical Improvements - Phase 1 is to provide the major reconstruction of two (2) 4-million-gallon cast-in-place concrete clear wells, installation of two (2) new meter vaults with magnetic flow meters, isolation valves and new wash water and plant water pumps. As well as the reconstruction of a pump station inlet flume, the addition of chemical injection points, sampling stations, and chlorine injectors, including associated piping, valves, electrical, instrumentation and control work.

Under Construction

Water / Sewer

$5,000,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Coordination, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Starting and Adjusting, Closeout Submittals, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Concrete Curing, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Flooring, Painting and Coating, High-Performance Coatings
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Solid Waste Control

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
83
Bidding Soon
3,582
All Active Projects
1,564
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2021

September 29, 2021

img_map_placeholder

501 E Brown St, Wylie, TX


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Wylie WTP II Structural and Mechanical Improvements - Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.