Site work and paving for a road / highway in Happy Valley, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Proposals received after the time fixed will not be considered. 2021 Street Improvement Project ODOT Class of Work: Asphalt Concrete Paving and Oiling, and Pavement Markings First-Tier Subcontractor Disclosure Form Due Thursday, June 15, 2021 at 4:00 PM The base bid for this project generally includes reconstruction, repair, and overlay street improvement for four (4) streets with a bid alternate for a fifth street: Proposed work includes the following: Schedule 'A' (SE Misty Drive) includes the following proposed work: O Pavement Grinding 1"- 4" depth: 18,037 +/- square yards, O Cement-Treated Sub-Grade (CTB): 1,777 +/- square yards (53 tons PCC, 6% Application Rate), O Overlay Street to 1" Thickness: 3,797 +/- square yards (237 tons), O Paving Street to 5" Thickness: 1,777 +/- square yards (487 tons), and O Striping: 24 +/- square feet of 12" stop bar, 180 +/- square feet of crosswalk, 2,022 +/- lineal feet of 8" white bike lane, 313 +/- lineal feet of 4" white lane line, 1,505 +/- lineal feet of 4" double yellow center line, 4 (four) bike lane symbols and arrows, 10 (ten) turn arrows, O ADA Ramp Construction: Removal and construction of 4 (four) ramps, Schedule 'B' (SE 114th Avenue) includes the following proposed work: O Pavement Grinding to Full-Depth (4"+/-): 1,628+/- square yards, O Cement-Treated Sub-Grade (CTB): 1,628 +/- square yards (49 tons PCC, 6% Application Rate), and O Paving Street to 4" Thickness: 1,628 +/- square yards (350 tons), Schedule 'C' (SE Ridgecrest Road) includes the following proposed work: O Pavement Grinding to Full-Depth (1"+/-): 388 +/- square yards, O Overlay Street to 1" Thickness: 4,479 +/- square yards (278 tons), O Striping: 18 +/- square feet of 12" bars, 140 +/- square feet of crosswalk, 1,857 +/- lineal feet of 8" white bike line, 962 +/- lineal feet of 4" double yellow center line, 6 (six) bike lane symbols and arrows, and O ADA Ramp Construction: Removal and construction of 4 (four) ramps, Schedule 'D' (Stevens Road and Monterey Avenue Roundabout) includes the following proposed work: O Pavement Grinding to Full-Depth (4"+/-): 1,633 +/- square yards, O Cement-Treated Sub-Grade (CTB): 1,633 +/- square yards (49 tons PCC, 6% Application Rate), O Paving Street to 4" Thickness: 1,633 +/- square yards (355 tons), and O Striping: 600 +/- square feet of crosswalk, Bid Alternate (SE Idleman Road) includes the following proposed work: O Pavement Grinding (1"+/-): 1,225 +/- square yards, O Overlay Street to 1" Thickness: 8,625 +/- square yards (537 tons), O 3/4"-0 Aggregate Shoulders, 2" Thickness: 93 +/- tons, O Striping: 5,050+/- lineal feet of 4" white fog line, 361 +/- lineal feet of 8" white bike lane, 2,721 +/- lineal feet of 4" double yellow center line, 94 +/- lineal feet of 4" white skip stripe and 1 (one) bike lane symbol and arrow. Once construction on the project has begun, the contractor must reach substantial completion within 60 days of commencing activity. To perform work, bidders must be prequalified with the Oregon Department of Transportation for the class of work defined above. Proof of prequalification must be submitted to the City by 2:00 PM on the Date of Public Bid Opening. This public works contract is subject to State of Oregon prevailing rates of wage requirements, per ORS 279C.800 through 279C.870. The City will not receive or consider bids unless the bid contains a statement by the bidder that the bidder will comply with ORS 279C.830.
Award
Roads / Highways
$765,515.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2021
July 15, 2021
Multiple Locations, Happy Valley, OR
Related To This Project
Happy Valley, OR
Bid Date: Jun 11 2020
Happy Valley, OR
Bid Date: Nov 30 2021
Happy Valley, OR
Bid Date: Mar 04 2021
Happy Valley, OR
--
Happy Valley, OR
Bid Date: Oct 05 2023
Happy Valley, OR
Bid Date: Nov 17 2020
Happy Valley, OR
Bid Date: Feb 08 2024
Happy Valley, OR
Bid Date: Feb 27 2024
Happy Valley, OR
Bid Date: Aug 04 2022
Happy Valley, OR
Bid Date: Feb 18 2022
Happy Valley, OR
Bid Date: Sep 06 2019
Happy Valley, OR
Bid Date: Feb 11 2022
Happy Valley, OR
--
Happy Valley, OR
Bid Date: Jul 21 2021
Happy Valley, OR
Bid Date: Dec 16 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.