Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a power facility in Middletown, California. Completed plans call for the renovation of a power facility.
Northern California Power Agency Project Description: Plants #1 & #2 Emergency Shower / Eye Wash Stations NCPA Bid No. GEO376 12000 Ridge Road Middletown, CA 95461 The project, as more particularly described in the Bid Documents includes, but is not limited to the replacement and installation of emergency shower and eye wash stations located at NCPA's Geothermal Plants #1 and #2. 3. Contractor's License Requirements. A bidder must be a contractor, holding a valid Class A license issued by the State of California, to perform the work for this project. The license must be active and in good standing as of the date of receipt of bids and must be maintained in good standing throughout the term of the contract. Minimum Wage Requirement. Bidders are hereby notified that, pursuant to Labor Code Sections 1770 et seq., the California Director of Industrial Relations has ascertained the general prevailing rate of per diem wages and rates in the locality where this work is to be performed. It shall be mandatory upon the Contractor to which the contract is awarded, and upon any subcontractor under the Contractor, to pay not less than the specified prevailing wage rates to all laborers, workers, and mechanics employed in the execution of the contract. Bid Bond. Each bid shall be accompanied by a certified check, cashier's check or bidder's bond payable to NCPA for an amount equal to ten percent (10%) of the amount of the bid. This guaranty will be forfeited to, paid to or retained by the Agency as damages should the bidder to which the Contract is awarded fail to enter into the contract or fail to present satisfactory bonds and/or insurance, as detailed in the Bid Documents, within ten business days of receipt of the Agency's Notice of Award of the Contract. Substitution of "or Equal" Materials. A bidder may propose one or more "equals" or substitutions for products listed in the Bid Documents by manufacturer name, brand or model number, unless the Bid Documents specify that the product is necessary to match others in use. Complete information for products proposed by a Bidder as an equal must be submitted to the Project Manager for review, at least ten business days before the time specified for bid opening in accordance with the Instructions to Bidders contained in the Bid Documents 8. Retainage. The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement. Payment (Labor and Materials) and Performance Bonds. The successful bidder will be required to furnish a Payment (Labor and Materials) Bond in the amount of one hundred percent (100%) of the contract price, a Faithful Performance Bond in the amount of one hundred percent (100%) of the contract price, and a Maintenance Bond in the amount of ten percent (10%) of the contract price. The bonds must be obtained from an admitted surety and comply with applicable law. The successful bidder will also be required to furnish insurance as set forth in the Bid Documents. Bidders must be on time or will be disqualified. The purpose of the conference is to review the bid requirements, to receive bidder questions and to review the site. Each bidder is responsible for signing the attendance sheet at the pre-bid conference to ensure qualified bid status. Any bid received by a bidder other than those included on the attendance sheet will be deemed non-responsive and the bid will be returned unopened. Award of Contract. A. Each bidder shall comply with and agree to all instruction and requirements in this Notice Inviting Bids and in the Bid Documents. All bids must be submitted on the prescribed bid proposal form. Notice of Compliance Monitoring. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The Agency reserves the right to reject any or all bids or to waive any informalities in a bid. The Agency will award the contract, if awarded, to the responsible bidder with the lowest responsive bid and whose bid proposal complies with the requirements prescribed. Contractor agrees to furnish all tools, equipment, apparatus, facilities, labor, materials, transportation and utility services and incidentals necessary to fully perform and complete, in a good workmanlike manner, free from any and all liens and claims from mechanics, material suppliers, subcontractors, artisans, machinists, teamsters, freight carriers, and laborers, 1. Plumbing piping insulation, jackets and accessories. 2. Plumbing equipment insulation, jackets and accessories . Rigid Aluminum conduit 2. Flexible metal conduit 3. Liquid tight flexible metal conduit 4. Nonmetallic conduit 5. Raceway fittings 6. Conduit bodies 7. Surface raceway 8. Pull boxes, junction boxes and manholes . Contractor shall provide a proposed project schedule prior to commencing work and complete the work no later than January 31, 2023
Award
Power Plant
$772,813.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 11, 2022
September 12, 2022
12000 Ridge Rd, Middletown, CA
Related To This Project
Middletown, CA
Bid Date: Aug 25 2022
Middletown, CA
Bid Date: Jun 21 2023
RFQ- D/B Middletown Unified School District Middletown Middle School New Gymnasium Project - 5253990
Middletown, CA
Bid Date: Jan 04 2024
Middletown, CA
Bid Date: Mar 29 2024
Middletown, CA
--
Middletown, CA
Bid Date: Aug 04 2022
Middletown, CA
Bid Date: Aug 25 2022
Middletown, CA
Bid Date: Feb 09 2023
Middletown, CA
Bid Date: Feb 09 2023
Middletown, CA
--
Middletown, CA
Bid Date: Aug 11 2022
Middletown, CA
Bid Date: Jul 06 2022
Middletown, CA
Bid Date: Dec 07 2022
Middletown, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.