Demolition, site work, paving and new construction of a bridge / tunnel in Clifton Park, New York. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://www.bizjournals.com/albany/news/2021/07/20/sitterly-road-bridge-replacement-saratoga-county.html Jul 20, 2021 The temporary bridge carrying Sitterly Road over the Interstate 87 Northway in Clifton Park will be replaced next year with a span that has a higher clearance for vehicles passing underneath, according to the state Department of Transportation. Sitterly Road is a major route between Clifton Park and Halfmoon, with the bridge carrying an average of more than 15,000 vehicles daily. It will be closed for about two months in summer 2022 when the temporary bridge is removed and replaced. Businesses in the immediate vicinity of the bridge include Ellis Medicine Emergent & Urgent Care, Stewart's Shops, Exit 9 Self-Storage and a dental practice. "It's certainly not going to be good for us, or anybody else," J. Eric King, owner of the self-storage, said of the bridge closure. Traffic will be detoured to Route 146 via Crossing Boulevard on the east side and Clifton Park Center Road/Clifton Country Road on the west side. The bridge was damaged April 14 when a boom lift on a truck trailer struck the overpass. The lift fell and temporarily blocked traffic between Exits 9 and 8A, snarling roads in the area. The driver was ticketed by the State Police. The damaged span had to be demolished and a temporary structure installed. The bridge reopened May 8. The bridge had a vertical clearance of 14-feet-4-inches prior to the collision. The new bridge will have a clearance of at least 16-feet-6-inches, which exceeds federal interstate standards, according to the DOT. The new bridge will have wider shoulders and a sidewalk on the north side, providing a link to future sidewalks along Sitterly Road, according to the DOT. Design is underway for the new bridge. The cost hasn't been determined. "Like any damage sustained to our system, we fully intend to seek restitution for all costs incurred by the state resulting from this crash," according to Bryan Viggiani, a DOT spokesman. ____________ Sitterly Rd Over I-87, Bridge Replace, Bin 1033210. Town of Clifton Park, Saratoga County. This Project is Located in the Capital District Region and Includes the Following: Counties Saratoga As of May 25, 2021,The current status of the project is In Development. The Bid Opening is expected to be in Fall 2021. Construction is expected to begin in Fall 2021. Construction is expected to be completed in Spring 2022. NYSDOT - Bridge Replace on I-87 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Bridges / Tunnels

$6,300,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
119
Bidding Soon
1,764
All Active Projects
742
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 1, 2023

September 30, 2023

img_map_placeholder

I-87, Clifton Park, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.