Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Spokane, Washington. Completed plans call for site work for a water / sewer project.
This project has been awarded to LaRiviere Inc. in the amount of $2,407,635. Hoffman Well Rehabilitation Engineering Services File No. 2018104 This project consists of the construction and rehabilitation of the Hoffman Well, including vertical turbine line shaft pumps, motors, motor control centers, steel casing liner, concrete pedestal, 8", 18" and 24" to 30" diameter piping, electrical, concrete vaults, excavation, site grading and restoration, structural modifica-tions to well caisson, fencing, water and sewer connections, electrical and conduit work, and other related miscellaneous items. Bids shall be submitted on the forms provided in accordance with the provisions of the Specifications. Irregular bid proposals will be rejected in accordance with the specifications. Cashier's check, a certified check or surety bond in the sum of five percent (5%) of the Total Project Bid must accompany the copy of the bid filed with the City Clerk. Successful bidder shall execute the Contract within TEN (10) calendar days after receiving the Contract. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated herein, the bid proposal deposit shall be forfeited to the City of Spokane. The City of Spokane will normally award this Contract or reject bids within FORTY FIVE (45) calendar days after the time set for the bid opening. If the lowest responsible Bidder and the City of Spokane agree, this deadline may be extended. If they cannot agree on an extension by the 45-calendar day deadline, the City of Spokane reserves the right to Award the Contract to the next lowest responsible Bidder or reject all Bids Masks will be required for entry. In accordance with SMC 7.06.500 and RCW 39.04.350(1), the low bidder shall complete the Supplemental Bidder Responsibility Criteria form located in Appendix C. Failure to promptly submit the form including supporting documen-tation if required may delay award of the Contract. Critical time limits exist this for project and are as follows: The contractor shall only be permitted to perform work on the Hoffman Well piping and pumps (interior and exterior), well casing, electrical components and all related appurtenances between the following dates, October 1st through April 15th No work on these items shall be allowed outside of these dates. Landscape restoration, grading and pavement patching are not included in this requirement and shall be in compliance as detailed in other sections of the Special Provisions The Method of Contractor Selection has not been determined at this time. Estimated project value- $2,240,448.00 to $2,899,403.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$2,407,635.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 21, 2021
August 20, 2021
To Be Determined, Spokane, WA
Related To This Project
Spokane, WA
Bid Date: Mar 04 2019
Spokane, WA
Bid Date: Jan 14 2019
Spokane, WA
Bid Date: Mar 25 2019
Spokane, WA
Bid Date: May 20 2019
Spokane, WA
Bid Date: May 20 2019
Spokane, WA
Bid Date: Feb 25 2019
Spokane, WA
Bid Date: Sep 28 2022
Spokane, WA
Bid Date: Sep 28 2022
Spokane, WA
Bid Date: Aug 31 2022
Spokane, WA
--
Spokane, WA
Bid Date: Aug 24 2022
Spokane, WA
--
Spokane, WA
Bid Date: Aug 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.