BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

New construction of an educational facility in Camarillo, California. Conceptual plans call for the construction of a educational facility.

Phase 2 of the Mixed-Use Center project will be located north of San Luis Road and will include multi-function classrooms and dry laboratories; a 275-bed student housing element; an annex to the existing student union; a health services suite; administrative offices; and the bookstore. Future expansion to this site may include a black box theater and/or a conference center component. Proceeding with this project is dependent upon a revision to the campus master plan, the approval of the Housing Proposal Review Committee, a viable financial plan, and qualification for placement in the Systemwide Revenue Bond Program. This project is currently in the FY 2021/2022 - 2025/2026 CIP. Per the owner, as of July 23, 2025, this project is on hold indefinitely. There is no anticipated restart date. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Project Abandoned

Educational

$129,994,000.00

Public - City

New Construction

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
177
Bidding Soon
2,792
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

Project location map

2222 Ventura Blvd, Camarillo, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.