BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Goodyear, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of October 13, 2022, this project has been awarded to a general contactor and construction began in September of 2022. *The closed solicitation has been included below for reference: ADOT Is Accepting Statements of Qualifications (Soqs) From Consultants to Provide Design Services for the Sr303, 51st & 43rd Ave Interchanges, New Traffic Interchanges All format requirements, submittal guidelines, instructions and documentation submission contained in this RFQ Package are for the ECS Contract Number and ADOT Project Number referenced above. SOQ submittals failing to follow the format, online submittal guidelines or any other instructions outlined in this RFQ Package shall be rejected. Ecs Reserves the Right to Reject Any and All Soqs, Cancel the Advertisement, Negotiations or Contract at Any Time in the Best Interest Of the State. Any firm that has submitted an SOQ as a prime consultant and is identified as a subconsultant in another prime consultant's proposal shall have their prime consultant SOQ submission rejected. If a Prime Consultant lists firms as Subconsultants in its SOQ, the Prime Consultant must be able to provide ADOT with evidence, if requested, of written consent provided by the Subconsultant firms that are listed as part of their Prime Consultant's SOQ, or that Prime Consultant's SOQ will be rejected. Questions, in writing, shall be received by ECS until June 3, 2021 at 2:00 P.M. Arizona Time. No further questions shall be accepted after the time specified This contract has been established as Race Neutral with a 0.0% DBE Goal Final Questions Due: June 3, 2021 at 11:00 A.M. Arizona Time Estimated Selection Date: July 6, 2021 Initial Cost Proposal Due Date (ANTP): July 13, 2021 at 5:00 P.M. Arizona Time Advance Notice to Proceed (ANTP) Date July 19, 2021 Full Cost Proposal Due Date: July 27, 2021 Estimated Contract Notice to Proceed Date: October 4, 2021 AZDOT - RFQ Engineering - SR303, 51st Avenue and 43rd Avenue Interchanges New Traffic Interchanges

Award

Roads / Highways

$2,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
11
Bidding Soon
686
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.