EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 1, 2021 at 8:00 PM

Updated September 14, 2023

Site work for a road / highway in Onawa, Iowa. Completed plans call for site work for a road / highway.

**As of July 1 2021, the project has been awarded to Beckstrom Construction for $413,608.50. The start and the end date has not yet been determined. A public hearing will be held by the City of Onawa, Iowa, on the proposed contract documents (plans, specifications and form of contract) and estimated cost for the improvement at its meeting at 7:00 PM on June 8, 2021, in the Council Chambers at City Hall, 914 Diamond Street, Onawa, Iowa, for the 2021 Onawa Electrical Distribution System Improvements - Phase II. The work shall commence on the day indicated in the Notice to Proceed and shall be substantially completed on or before April 12, 2022 and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before May 10, 2022. Should the Contractor fail to complete the work in this timeframe, liquidated damages of $250.00 per calendar day will be assessed to the work not completed within the designated contract term. Each bidder shall accompany its bid with bid security as defined in Iowa Code Chapter 26, Section 26.8, and as specified by the City of Onawa, Iowa, in the amount fixed in the Instructions to Bidders. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. The general nature of the public improvement is Labor only to upgrade areas of existing 2.4 kV electrical distribution system to 13.2Y/7.62 kV utilizing underground construction standard(s). The successful bidder will be required to furnish bonds in an amount equal to one-hundred percent (100 percent) of the contract price, said bonds to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of Contractor.

Award

Roads / Highways

$413,609.00

Public - City

Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
14
Bidding Soon
383
All Active Projects
156
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2021

August 16, 2021

img_map_placeholder

To Be Determined, Onawa, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.