BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a swimming pool in Hamburg, New York. Completed plans call for the renovation of a swimming pool.

Replace pool gutter, upgrade electrical, filtration and chemical treatment systems. The following work is assigned to each Prime Contract: 1. All sections of Division 00 – Procurement and Contracting Requirements. 2. All sections of Division 01 – General Requirements. B. The following notes are assigned to each Prime Contract: 1. Bidders are forewarned to review all information in the Contract documents. 2. All Bidders shall visit the site to verify and review existing conditions before estimating the cost of the project. 3. All Contractors are responsible for the layout and survey of their own work. 4. All Contractors are responsible for dewatering for the work of their contract. 5. All Contractors are responsible for offsite disposal of unsuitable spoil and/or excess soils resulting from their own work. 6. All Contractors are required to construct the project per the Schedule. All Contractors shall cooperate fully with the intentions of the schedule. 7. Each Contractor shall provide temporary shoring, bracing, supports, or protection systems needed to complete the Work of their Contract. All Contractors are responsible, individually, and collectively, for maintaining safe-working conditions at all times in compliance with OSHA safety regulations. Contractors will be responsible, where required by the Owner or Architect, to provide Professional Structural Engineering design for temporary shoring, bracing, supports or protection systems. 8. All Contractors are responsible for the safety of their own workers, subcontractors, and other personnel on site. Each and every Contractor is responsible for maintaining a safe work site, and for maintaining safe work procedures. Protect all Village facilities and personnel. 9. Each Contractor is required to implement and maintain a project specific safety program. The program shall include company safety philosophy, history, action plan, manuals, hazardous communications sheets, OSHA filings, meeting minutes and a reporting system for any accidents or injuries.

Bid Results

Swimming Pools

$1,048,000.00

Public - City

Renovation

17

19

6

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
97
Bidding Soon
2,180
All Active Projects
935
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2022

December 20, 2022

img_map_placeholder

80 Torry Dr, Hamburg, NY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.