BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Poplar, Wisconsin. Completed plans call for the renovation of a wastewater treatment plant.

As of June 24 the project is set to be awarded on June 29 Board Meeting.. Work shall include repairs to the Village's Lagoon No. 3 liner system. The North and East slopes have sloughed, or slid down the berm, causing an unevenly sloped lagoon berm and damage to the liner and cover. Lagoon No. 3 is currently offline and has a small amount of final effluent and sludge in it (approximately 4 ft, or 70,000 gallons). Repairs shall include pumping sludge and final effluent from Lagoon No. 3 to Lagoon No. 1A, removal of the sloughed rock blanket and sand material (referred to as "lagoon spoils"), removal of the damaged PVC liner such that a straight seam is created, restoration of sideslope to approximately 3:1, installation of a new PVC liner section and welded to the existing liner, placement of new cover sand and new rock blanket over the new liner, reinstalling and straightening the lagoon cover (which is currently disassembled and located adjacent to the lagoon), and placement of the lagoon spoils to the designated area within the existing site for future beneficial use to the Village. The lagoon spoils will be used to create additional usable land near the existing WWTF control building and shall meet the minimum placement requirements described in the specifications and on the contract drawings. Proposal #2: Work shall include replacement of the Village's Lagoon No. 3 liner system. Lagoon No. 3 is currently offline and has a small amount of final effluent and sludge in it (approximately 4 ft, or 70,000 gallons). Replacements shall include pumping sludge and final effluent from Lagoon No. 3 to Lagoon No. 1A, removal of the liner coversand and rock blanket over the entire lagoon, removal of the entire PVC lagoon liner, restoration of sideslopes to approximately 3:1 where necessary to match sideslopes shown on details from record drawings, installation of a new PVC liner, placement of new cover sand new and rock blanket over the new liner, reinstalling and straightening the lagoon cover (which is currently disassembled and located adjacent to the lagoon), and placement of the lagoon spoils to the designated area within the existing site for future beneficial use to the Village. The lagoon spoils will be used to create additional usable land near the existing WWTF control building and shall meet the minimum placement requirements described in the specifications and on the contract drawings Bid Result PROPOSAL #1 TOTAL Wren Works-$50,412 PROPOSAL #2 TOTAL Wren Works-$72,295

Award

Water / Sewer

$122,707.00

Public - City

Renovation

15

16

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
110
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2021

August 1, 2021

img_map_placeholder

10435 E Bayfield Rd, Poplar, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.