BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This Project is in the northwest corner of S Cloverdale Street and 5th Ave S in the City of Seattle. following elements of Work: Construction stormwater erosion control; clearing & grubbing; demolition and removal of existing surface pavement, sidewalks, and curbs; installation of a complete surface drainage system, including: storm drainage piping, drainage structures, and bioretention cells; site restoration, including: surface paving, asphalt and gravel paths, sidewalks, curbs, driveway, and curb ramp, and final planting and landscaping. No pre-bid site inspection has been scheduled for this Project. For purposes of the Inclusion Plan, this is considered an UNDERGROUND type of project with a Past Performance of 14% WMBE utilization rates based on completed projects. For questions on the Inclusion Plan please contact Miguel Beltran at Miguel.beltran@seattle.gov or 206-6844525. Back-up contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188. Bidders must understand the requirements of SMC 14,16 and RCW 49.46 and demonstrate compliance prior to Award. For purposes of the Inclusion Plan, this is considered a UNDERGROUND type of project with a Past Performance of 14% WMBE utilization rates based on completed projects. Questions must be submitted no later than 5:00 p.m. 3 Business Days before the Bid Opening Date. Only written questions will be accepted for this project. Please submit your questions to Kai Fan at kai.fan@ seattle.gov. This Project consists of the following elements of Work: Construction stormwater erosion control; clearing & grubbing; demolition and removal of existing surface pavement, sidewalks, and curbs; installation of a complete surface drainage system, including: storm drainage piping, drainage structures, and bioretention cells; site restoration, including: surface paving, asphalt and gravel paths, sidewalks, curbs, driveway, and curb ramp, and final planting and landscaping If the Work is not Substantially Complete within the Contract Time, the Contractor must pay to the Owner, as Liquidated Damages, the sum of $2,350.00 for each Working Day that the Work has

Award

Water / Sewer

$303,000.00

Public - City

Paving, Site Work

19

12

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
48
Bidding Soon
901
All Active Projects
333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.