Site work for a water / sewer project in Poway, California. Completed plans call for site work for a water / sewer project.

Description of Project: The work on this project generally includes but is not limited to furnishing all products, labor, equipment, material, transportation, and incidental services to construct and make a fully operational potable water Clearwell Bypass System at the City of Poway, Lester J. Berglund Water Treatment Plant comprised of the following major elements: 1. Bypass Tanks: Two above-ground bolted steel water storage tanks; each with 1.4 million gallons (MG) nominal volume and tank appurtenances. 2. Bypass Pump Station: Pump station utilizes vertical turbine pumps (three operational plus one standby); flow meter; and appurtenances including power supply, variable frequency drives and control system. There are contractor related options associated with the pump station such as: a. Use of contractor designed and fabricated (City approved) steel trusses between pump cans and suction supply piping to aid in the installation of the pump station. b. Use of a pre-engineered pump station fabricator to provide a packaged pump skid with pump cans, suction piping, electrical cabinets, pre-routed conduit and wire, motor control center, variable frequency drives, and control system to reduce costs and construction duration. 3. Pressure Control Facility: Above ground pressure control facility with two pressure reducing valves and appurtenances. 4. Permanent Bypass Pipeline: Approximately 1,165 linear feet of 36" diameter buried cement mortar lined and coated (CML&C) welded steel pipeline with valves, appurtenances and connections. 5. Temporary Bypass Pipeline: Approximately 1,690 linear feet of 24" above ground high-density polyethylene (HDPE) pipeline with valves, appurtenances and connections. 6. Temporary Bypass Overflow Pipe: Approximately 330 linear feet of 24" HDPE above ground pipeline with overflow catch basin and discharge connection to storm drain swale. 7. Electrical power: Power supply for bypass tank site, bypass pump station and pressure control facility including electrical conduits, conductor and appurtenances. 8. Instrumentation and controls: Instrumentation and control system for bypass tanks, bypass pump station and pressure control facility including signal conduits and conductors from the respective sites to the electrical room at the plant. 9. Tank site security: Cameras and radio transmission system to convey signals to existing plant security system. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Please direct all questions during the bidding process to Jessica Parks, Utilities Administrator, at (858) 668-4703 or via email at JParks@poway.org. The award of the Contract, if it is awarded, will be to the lowest responsible bidder. PRELIMINARY ENGINEER'S ESTIMATE: $7,060,000 Contract or technical questions will be accepted after 5 p.m. on Monday, June 21, 2021 Addendum #1-#3 has been issued.

Award

Water / Sewer

$7,273,700.00

Public - City

Site Work

53

20

25

13

Subscribe For Documents

86 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
101
Bidding Soon
1,546
All Active Projects
722
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.