Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 28, 2025 at 8:00 PM
Updated May 31, 2025
Site work, paving and outdoor lighting for a mixed-use development in Cincinnati, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.
The planned Reading Road Corridor is an 9.2-mile BRT line connecting downtown Cincinnati to Cincinnati's Roselawn neighborhood. The BRT line will run from Downtown to the Over-the-Rhine, Mt. Auburn, Clifton Heights-University Heights neighborhoods, and Cincinnati's Uptown district. From Uptown it proceeds northeast, serving the neighborhoods and business districts of Corryville, Avondale, North Avondale, Paddock Hills, Bond Hill, and Roselawn. Deadline to Submit Questions:May 16, 2025, 5:00pm Addendum/Response to Questions/Clarifications:May 23, 2025, 5:00pm SORTA will also develop a Hamilton Avenue corridor that will share a portion of its service line with the Reading Road corridor. The portion common to both corridors is to be constructed between Downtown and Cincinnati's Uptown district. The common portion is included as part of the Reading Road Corridor 9.2-mile BRT line. The design is currently in progress, and the construction is expected to include: o Civil Package - Roadway Resurfacing, Drainage Improvements, Utility Relocations, Sidewalk, ADA Curb Ramps, Lighting, Pavement Markings; o Construction Of 13 BRT Stations With All Supporting Systems Elements; and o Traffic Signal Modernizations. Start of construction on Reading September 2026 End of construction on Reading April 2028 Project Scope The planned Reading Road Corridor is an 9.2-mile BRT line connecting downtown Cincinnati to Cincinnati's Roselawn neighborhood. The BRT line will run from Downtown to the Over-the-Rhine, Mt. Auburn, Clifton Heights-University Heights neighborhoods, and Cincinnati's Uptown district. From Uptown it proceeds northeast, serving the neighborhoods and business districts of Corryville, Avondale, North Avondale, Paddock Hills, Bond Hill, and Roselawn. SORTA will also develop a Hamilton Avenue corridor that will share a portion of its service line with the Reading Road corridor. The portion common to both corridors is to be constructed between Downtown and Cincinnati's Uptown district. The common portion is included as part of the Reading Road Corridor 9.2-mile BRT line. The design is currently in progress, and the construction is expected to include: o Civil Package - Roadway Resurfacing, Drainage Improvements, Utility Relocations, Sidewalk, ADA Curb Ramps, Lighting, Pavement Markings; o Construction Of 13 BRT Stations With All Supporting Systems Elements; and o Traffic Signal Modernizations.
Post-Bid
Roads / Highways
$100,000,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2025
September 1, 2026
Multiple Locations, Cincinnati, OH
Related To This Project
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed