BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Greenville, Alabama. Completed plans call for the renovation of a medical facility.

The work of the project includes, but is not limited to, interior and exterior renovations of existing ema building including: selective demolition, masonry walls, doors, storefront, hardware, drywall partitions, painting, other interior finishes, and mechanical and electrical; coordination and supervision of the entire project, and all related work, as indicated in the bid and contract documents. A cashier's check or bid bond payable to butler county commission in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and statutory labor and material payment bonds, and insurance in compliance with requirements, will be required at the signing of the contract. Workmen's compensation, extended fire and tornado insurance, public liability and property damage insurance and builders risk insurance will be required. Insurance in compliance with requirements will be required at the signing of the contract. The successful bidder will be required to submit 100% performance and payment bonds or an irrevocable "Letter of credit" which is acceptable to the owner. All bonds and letters of credit shall be for 100% of the contract price. Attention of bidders is called to the license required by title 34, chapter 8, of the code of alabama, 1975, and amendments thereto, relating to the licensing of general contractors. No bid will be accepted from anyone, except a qualified contractor, licensed by the state licensing board for general contractors, unless otherwise required by the state licensing board. Aia general conditions, aia document a-201 "General conditions of contract for construction", 1997 edition, issued by the american institute of architects is part of the specifications for this project, except as modified by the project manual. Other sets for general contractors, and sets for subs and dealers, may be obtained with the same deposit, which will be refunded as above, less cost of printing, reproduction, handling and distribution, which is estimated to be the same as the deposit amount. Partial sets will not be available. To expedite distribution of bid documents email requests with a copy of the deposit check(s) referencing this project to missy.Lee@gmcnetwork.Com. Hard copy deposit checks referencing this project should be mailed to goodwyn mills cawood, llc; attn: missy lee; po box 242128; montgomery, al 36124; fax no.: (334) 272-1566. Bids must be submitted on proposal forms furnished by the architect or copies thereof. All bidders bidding in amounts exceeding that established by the state licensing board for general contractors must be licensed under the provision of title 34, chapter 8, code of alabama, 1975, as amended, and must show such evidence of license before bidding or bid will not be received or considered by architect or owner; the bidder shall show such evidence by clearly displaying their current license number on the outside of the sealed envelope in which the proposal is delivered; bidder must also include their current license number on the proposal form. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. This project is being funded in part by cdbg project no.: cv-nc-20-021 . Adeca requires all entities participating in federally funded projects to be registered in sam (system for award management) "Prospective bidders must provide proof of active sam status with their bid." all bidders must comply with the president's executive order number 11246 which prohibits discrimination in employment regarding race, creed, color, sex or national origin. All bidders must comply with title vi of the civil rights act of 1964, the davis-bacon act, the anti-kickback act and the contract workhours act. The attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, section 3, segregated facilities, section 109 and e.O. 11246 This project is being bid including taxes, and requires the contractor to enter into an agreement with the owner, wherein the contractor will be authorized to make materials purchases with purchase orders issued or authorized by the owner, provide tabulated invoices to the owner for owner's payment at least once monthly, so as to take advantage of the owner's tax exempt status, and otherwise to administer the sales and use tax savings portion of the project for the owner, as a part of their bid. Taxes will then be deducted from the contract amount either from payments issued to the contractor or by change order at the end of the project, as elected by the owner. Additional qualifications and requirements for general contractor bidders and separate subcontractors are indicated in the bid and contract documents. The owner reserves the right to reject any or all proposals and to waive technical errors if, in their judgment, the best interests of the owner will thereby be promoted. The butler county commission is an equal opportunity employer and encourages the participation of women and minority owned businesses (ombes) and section 3 qualified contractors in all project contract procurements. Butler county commission greenville, alabama joe peavy, chairman goodwyn mills cawood, llc members, american institute of architects 2660 eastchase lane, suite 200 montgomery, al 36117 phone: (334) 271-3200 fax: (334) 272-1566

Post-Bid

Medical

$300,000.00

Public - County

Renovation

38

16

12

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
13
Bidding Soon
304
All Active Projects
119
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2023

June 29, 2023

img_map_placeholder

800 E Commerce St, Greenville, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.