BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 27, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a mixed-use development in Portage, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

20231114012. 6040-00-74 WISC 2024024 Portage - Fox Lake; 0.19 Mi W of Morris Drive to STH 73, STH 033 Columbia County Estimate Anticipated Funding $7,000,000 - $7,999,999 Work Summary: Excavation, Base, Hma Pavement, Culvert Pipe, Curb And Gutter, Beam Guard, Pavement Marking, Bridge Deck Replacement. Work Type: AD DBE Goal: 4% Guaranty Required: $ 100,000.00 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Completion Date Contract: November 01, 2024 WI DOT - 012 - Portage - Fox Lake *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$6,249,992.00

Public - State/Provincial

Paving, Site Work

201

9

4

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
69
Bidding Soon
1,082
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2023

January 15, 2024

Project location map

WI-33, Portage, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.