BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Dallas, Texas. Completed plans call for the renovation of a transportation facility.

The DFW Airport, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. SOLICITATION: 9500742 Terminal D End of Life Electrical & Mechanical Systems PRE-BID CONFERENCE: June 8, 2021 1:30pm (Central Time), via GoToMeeting BID DUE DATE AND TIME: July 9, 2021, 3:00pm (Central Time) MINORITY/WOMEN BUSINESS ENTERPRISE (M/WBE) GOAL: 20% CONTACT: Contract Administrator, Cynthia Don (972) 973-1867 cdon@dfwairport.com BID DROP OFF LOCATION: DFW International Airport Board, Design, Code and Construction Offices, 3003 South Service Road, DFW Airport, TX 75261 In the event of the award of a Contract, the undersigned will deposit with the Board a Contract Performance Bond and a Payment Bond as required by the Contract Documents, guarantying faithful performance of the Contract, and any payment of all labor, materials and other sundry items, in accordance with the Contract Documents, and will deliver certificates of insurance evidencing insurance required by the Contract Documents 1. Replacement of three (3) loading dock levelers, six (6) dock lock truck restraint safety devices, and all associated equipment at six existing loading bays on service level. 2. Replacement of seventy-four (74) radiant heat units in the ramp work areas. 3. Replacement of the crosswalk safety light system located on the arrival and departure levels between the parking garage and Terminal D building, near Gate D31 entrance. 4. Refurbishment and/or replacement of the landside lighting system around the Terminal D parking garage including roadway accent, planter boxes, arrivals level canopy lights, and sculpture display near Gate D22 entrance. 5. Provide down lighting and replacement of accent lighting at the entrance to the Terminal D garage building, at the approach road on arrivals level.

Award

Transportation Terminals

$749,728.00

Public - City

Renovation

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
77
Bidding Soon
3,546
All Active Projects
1,298
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2021

September 1, 2021

img_map_placeholder

3003 S Service Rd, Dallas, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.