EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 30, 2021 at 8:00 PM

Updated October 1, 2024

Site work, paving and new construction of a bridge / tunnel in Spring, Texas. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Harris County is soliciting bids for bridge construction of Gosling Road over Spring Creek for Precinct 4. This project consists of the vendor furnishing all personnel, labor, materials, and incidentals necessary for the construction of the widening of Gosling Road from Creekside Forest Drive to Gatewood Reserve Lane to complete the full four-lane boulevard roadway section. This includes an 1817-foot bridge crossing over Spring Creek. A bid bond or cashier's check for five percent (5%) of the total bid as required in attachment b., Bid Guaranty and Performance and/or Payment Bond Information Requirements, as well as attachment c., Bid Check Return Authorization Form, if applicable Harris County strives to engage with prime contractors and subcontractors that represent the diverse businesses of the County. We will ensure that historically underutilized minority- and woman-owned businesses (M/WBEs) receive a fair and equal opportunity to participate in the County's procurement process. The County requires Vendors to make a good faith effort to meet or exceed a 10% goal for participation by M/WBEs on this project. Failure to either demonstrate that the proposer will meet the M/WBE goal or made sufficient good faith efforts to do so at the time of bid submission will result in the rejection of the bid. The ability or desire of the proposer to perform the project work with its own organization does not relieve the proposer of the responsibility to make good faith efforts. Questions relating to this bid must be submitted in writing online The deadline for submission of questions relating to this bid is June 11, 2021, no later than 12:00 p.m. CST. All questions submitted in writing prior to the deadline will be compiled and answered in writing. A copy of all questions and answers will be forwarded via online, fax and/or email to all firms. The County will not be bound by any information conveyed verbally. If vendors require additional assistance, please contact Antoinette Lewis, Office of the Purchasing Agent, via email to antoinette.lewis@pur.hctx.net. 4191315, 4191314

Bid Results

Bridges / Tunnels

$7,992,201.00

Public - County

New Construction, Paving, Site Work

194

10

7

6

Subscribe For Documents

93 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Compaction, Embankments, Roadway Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Planting, Plants, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Material Storage, Bulk Material Storage
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
76
Bidding Soon
2,454
All Active Projects
962
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2021

August 20, 2021

img_map_placeholder

Gosling Rd, Spring, TX

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bridge Construction at Gosling Road over Spring Creek for Harris County Precinct 4

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.