BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a water / sewer project in Bastrop, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Sealed Proposals for the Construction of the Colony M.U.D 1A, Wastewater Treatment Plant, Phase 2b Improvements (Bastrop, TX). The work generally consists of Wastewater Treatment Plant Installation, along with Sitework and Erosion Control Items (the "Project"). All questions, clarifications and requests regarding the project must be received in writing via email to Rob Hesley and received no later than 12:00 p.m., June 21, 2021. Any requests received after said time and date will not be addressed. A cashier's check, certified check, or bid bond, payable to Hunt Communities Bastrop, LLC, in an amount not less than 5% of the bid must accompany each bid proposal as a guarantee that, if awarded the contract, the bidder will, within 10 days of the award of the contract, enter into a contract and furnish an acceptable Performance and Payment Bond. The bidder's surety will be forfeited and become the property of the Owner should the bidder fail to enter into a contract and furnish Payment & Performance Bonds acceptable to the Owner within 10 days after award of the contract. A Maintenance Bond will be required in the amount of 10% of the contract and is to remain in force for a period of one year from the date of the letter of final acceptance from The Colony M.U.D. No. 1A. No Proposals shall be withdrawn for a period of 90 days after the opening of the bids. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding. The owner shall reserve the right to award all projects to the same bidder or individual contracts to individual bidders. The Successful Bidder(s), if any, will be the responsible Bidder(s) which in the Owner's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. Prevailing Wage Rates, in accordance with Government Code 2258 are applicable to this project.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
44
Bidding Soon
2,327
All Active Projects
891
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2021

July 23, 2021

img_map_placeholder

To Be Determined, Bastrop, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.