Site work and new construction of a mixed-use development in Austin, Texas. Conceptual plans call for the construction of a 302,000-square-foot, six-story above grade municipal facility; for site work for a municipal facility; and 2,000-space parking garage.

As of 2024 this project is abandoned. Per the owner - All contracts associated with the North Austin Complex, Phase 2 project have been cancelled. *The previous solicitation is listed below for reference In accordance with the provisions of Texas Government Code, Chapter 2254, Subchapter A, Professional Services, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting submittal of qualifications to provide prime professional architectural/engineering (A/E) services for Project #20-027-8061 for execution and completion of Phase II of the North Austin Complex for one new six[1]level office building, one new multi-level parking structure, and related utility infrastructure and landscaping at the North Austin Complex in Austin Texas, as described further in the project description below It is the intention of TFC to award a Contract for full prime professional architectural/engineering (A/E) services for the term of the project. Services undertaken pursuant to this RFQ will be required to commence within fourteen (14) calendar days of delivery of a Notice to Proceed. The Project associated with the services requested in this solicitation is anticipated to be sixty (60) months. Phase Two of the plan to be comprised of an approximate 302,000 gross square foot building on the existing John H. Winters Campus in the vicinity of 51st street and Lamar Blvd. and a parking structure with approximately 2,000 parking spaces. More specifically, the "Project" is comprised of: i) New State Office Building - approximate six (6) level office building, totaling 302,000 gross square feet (GSF) located along the west edge of the John H Williams campus. Structure to be south of 51st street in the vicinity of the intersection of W. Guadalupe and Lamar Blvd. ii) New Multi-level Parking structure - six (6) level above grade parking structure accommodating 2000 parking spaces. Approximate location to be on the east side of the John H Winters campus on the west side of Guadalupe street within the existing surface parking. iii) Connection to existing Central Utility Plant located in the garage of Phase I and expansion of plant equipment to accommodate Phase II. Based on the Preliminary Master Plan for the North Austin Complex, the A/E will be required to coordinate with the SSE firm separately hired by TFC and provide full design, comprehensive construction documentation, construction award, and construction administration services, throughout the entire duration of the project. A/E services shall include, but not be limited to, the following: a) Limited Master Planning services, preliminary budgeting and scheduling, space programming, schematic design, design development, construction documents, construction administration, project oversight. This would include all other services necessary and or reasonably inferable or as further described in Attachment D, A/E Service Contract Template. Note that work may be broken up into separate packages, potentially site utilities, shell and finish out or garage and tower. b) Submit milestone based intermediate reports, documentation and estimated budgets as outlined in the A/E contract for each portion of the project. c) Attend and participate in meetings with CMR, TFC and agency stakeholders as well as coordination meetings with city departments as required. d) Detailed on-site investigations, review of existing documents and coordination with the SSE for utility infrastructure requirements. e) Planning services to include coordination to accommodate environmental issues that may be found as part of the SSE scope. f) Review and use geotechnical reports and soil investigations, performed by the SSE, for incorporation into the design of foundation and structural systems. g) Review all applicable documentation provided by the SSE and coordination with the City and utility providers as required to size and design the electrical, water, storm and building utility load requirements for this development. This includes utility sizing for future phases and a central physical plant for the complex. h) Detailed design and documentation of construction drawings and specifications. i) Conduct a full building code analysis and report including design considerations to maximize energy and water conservation per SECO energy efficiency and water conservation standards for new construction. The study will evaluate utilizing alternative energy design to determine if they are economically feasible. Building design to incorporate LEED design elements but not require LEED certification. j) Provide a preliminary list of necessary testing and inspections to be provided to the Owner including, but not limited to, accessibility, commissioning, testing and balancing, environmental, and construction materials testing. k) Assist in the evaluation, interview, and selection of the Construction Manager-at-Risk (CMR). l) Collaborate with CMR in the preparation of separate bid packages for potential phasing of construction. m) Collaborate with CMR in developing or adjusting scope of work to match available funding. n) Conduct public relations outreach and presentations to neighborhood groups at appropriate milestones. o) Research, evaluate, and present to the Owner any energy conservation strategies and alternatives for consideration, including the availability of rebates from the local utility. If rebates are available, coordinate with the local utility to complete all necessary documentation to accomplish rebates. p) Submit applicable drawings and project registration documentation to the Texas Dept. of Licensing & Regulation as required for all portions of the project or applicable bid packages. q) Coordinate with third party commissioning agent throughout design and construction administration. r) Coordinate with third party Project Controls group throughout design and construction administration. s) Assist CMR during subcontractor solicitation for development of Guaranteed Maximum Price. t) Conduct Construction Administration per AE contract requirements. u) Provide BIM management throughout the project. v) Conduct warranty management, and project closeout *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Project Abandoned

Municipal

$131,100,000.00

Public - State/Provincial

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
2,360
All Active Projects
920
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.