Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Brunswick, Maine. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
The intersection of Bath Road and Thomas Point Road currently function at a Level of Service of F indicating that those utilizing the intersection experience significant delay when entering and existing the intersection. The intersection is classified as a high crash location by the MaineDOT and is considered a contributing factor in the high crash location at the intersection of Bath Road and Gurnet Road. The MaineDOT has indicated that no projects that will require a turning movement permit consisting of 100 trips in the peak hour will be granted on Thomas Point Road until the Level of Service and accident pattern have been addressed, preventing any significant development on Thomas Point Road. To address both the Level of Service and accident concerns of the MaineDOT Perryman Drive will be constructed from the new signal installed at the intersection of Landing Drive and extended to Thomas Point Road. This work would provide the existing businesses and future businesses on Thomas Point to access the Cooks Corner area through a signalized intersection and would reduce the need for motorist to utilize Bath Road to access Thomas Point Road. As of July 24, 2024, this project is currently in the FY 2025-2029 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2026-2027. Further information regarding a design firm or detailed construction timeline has not been made available. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$1,900,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
Perryman Dr, Brunswick, ME
Related To This Project
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
Bid Date: Sep 15 2023
Brunswick, ME
--
Brunswick, ME
Bid Date: Oct 03 2023
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
Bid Date: May 17 2023
Brunswick, ME
Bid Date: Apr 27 2023
Brunswick, ME
--
Brunswick, ME
--
Brunswick, ME
Bid Date: Mar 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.