BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a road / highway in Akron, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of March 22, 2023, an architect and general contractor have been selected for this project. This project is under construction. A firm timeline for construction completion has not been confirmed but estimated to be completed by July 2025. The closed solicitation has been included below for reference. In 2021, the Ohio Department of Transportation began a $160 million project to make substantial improvements around the Akron Beltway. The project includes pavement replacement and addition of lanes on I-77 between U.S. 224 and State Route 8, pavement replacement on I-76/I-77 from Princeton Ave. to the I-77/State Route 261 interchange and pavement replacement on I-76, I-77 and State Route 8 at the Central Interchange. The project also includes resurfacing of State Route 8 and the addition of a southbound lane on State Route 8 between Carroll St. and Beacon St. and the re-alignment of left hand turn ramps (I-76 westbound to I-77 southbound and I-76 eastbound to State Route 8 northbound) to improve turn radius. The project also includes: The reconstruction of I-76 between East Avenue to Princeton Street The reconstruction of I-77 from State Route 8 to Waterloo Road Resurfacing State Route 8 just north of I-77/I-76 Adding a southbound lane on State Route 8 between Carroll Street and Beacon Street The reconstruction of the left-hand ramps on I-76 (I-76 West to I-77 South and I-76 East to State Route 8 North). The reconstruction of I-77 between Waterloo Road and the Central Interchange and on I-76 between Princeton Avenue and East Avenue is scheduled to take place between late 2021 and 2024. The entire project is expected to be completed by July 2025. Ruhlin/Shelly and Sands Akron Beltway Joint Venture are the contractors for the project.

Under Construction

Roads / Highways

$160,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
87
Bidding Soon
1,016
All Active Projects
373
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2022

img_map_placeholder

Multiple Locations, Akron, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.