BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Hopkinton, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

https://www.metrowestdailynews.com/story/business/transportation/2022/11/25/mass-pike-495-infrastructure-upgrade-enters-construction-phase-nov-28/69666336007/ - Nighttime construction crews will begin installing temporary barriers next week along the shoulders of the roadways near the junction of the Massachusetts Turnpike and Interstate 495, as a long-anticipated $466 million infrastructure improvement project enters its construction phase. Barry Lorion, director of the state Department of Transportation's Highway 3 Division, confirmed last week during a virtual forum that barrier installment was set to begin Monday. The action won't alter the number of lanes available for motorists. "We at MassDOT are confident in our ability to complete this challenging project," Lorion said. "The project will eliminate the old toll booth area (on the Pike) and weaving areas, all while working with an extremely sensitive environmental resource area and with neighborhoods close by." The project calls for all ramps associated with the I-495/I-90 interchange to be replaced in such a way as to reduce crashes, travel time and traffic. The interchange, which straddles the Hopkinton-Westborough line, borders the Roosevelt Farms neighborhood and Whitehall Reservoir. Construction and replacement of the ramps will extend three-fourths of a mile in each direction of the interchange, with Lorion saying the revised roadway will be "unrecognizable" after construction. The project is scheduled to be completed by June 2027, and involves replacing all ramps as well as bridges over Fruit Street, Flanders Road and over the MBTA. The state is partnering with construction firms Barletta, O&G and Aetna Bridge Company, as well as design firm VHB. The interchange is extremely busy, carrying more than 75,000 cars per day, including about 50% of eastern Massachusetts' commercial truck traffic, according to MassDOT. Stage 1, which is scheduled to be completed in the fall of 2024, includes a reworked I-495 northbound, construction of the new Fruit Street bridge (in two stages), and two new ramps between the two highways. "All of these actions will have limited impact on the traveling public," said Donald Cooke, VHB design manager, during last week's meeting. "A little later this year and into next year, you'll start to see some of the actual construction." _______________________________________________________________________________________ As of 5/17/2022 this project has not yet been awarded. A timeline for award has not yet been established. Location: Hopkinton-Westborough Project Type: Bridge - Construction Federal Aid No : NFP(IN)/HIP(BR)/NHP(IM)-495S(301) MASSDOT - RFQ D/B - Hopkinton-Westborough - Interchange Improvements, Interstate 495 (NB and SB) at Interstate 90 (EB and WB) Mandatory Pre-Proposal Meeting (Virtual- by email invitation) 11/9/2021 11 AM-12 PM ATC Meeting -1 11/16/2021 ATC Meeting -2 12/3/2021 RFP Close date for Questions 1/3/2022

Post-Bid

Roads / Highways

$339,185,107.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
623
Active Projects
369
Bidding Soon
5,023
All Active Projects
2,130
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 23, 2022

June 30, 2022

img_map_placeholder

Multiple Locations, Hopkinton, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.