This is a service / maintenance or supply contract in Denver, Colorado. Contact the soliciting agency for additional information.

The Project Work Will Include Consolidation of Three Waste Rock Piles Into an Onsite Geomembrane Lined Repository. The Consolidation Area Will Be Prepared and a Rock Cap Will Be Placed on the Repository. The Excavated Areas Will Be Reclaimed With Topsoil and Revegetated. Service Start : 8/30/2021 Service End : 10/28/2021 The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done. This Bid is accompanied by the required Bid Guaranty. You are authorized to hold said Bid Guaranty for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Director, Division of Reclamation, Mining and Safety may retain said Bid Guaranty, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, Certificates of Insurance and any other documents required by the Special Conditions. The bidder agrees to complete the entire project within _60_ calendar days from the Notice to Proceed. A bid bond is required for all jobs over $50,000.00. A bid guarantee in an amount not less than five percent (5%) of the total bid price must be submitted in the form of a firm commitment, such as a bid bond, bank money order, certified check or cashier's check. Checks or money orders should be made payable to the Treasurer, State of Colorado. If a bid bond is submitted, the State form shall be used. An irrevocable letter of credit is not acceptable as a bid guarantee. The CONTRACTOR shall furnish a labor and material payment bond for 100 percent of the original contract price and a performance bond for 100 percent of the original amount of the contract The bidder understands that if this Bid is accepted, he must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance and any other documents required by the Special Conditions within ten (10) days from the date of the Notice of Award. The purpose of the Pre-Bid meeting is to afford potential bidders the opportunity to inspect the proposed work and access conditions. In order to ensure compliance with ongoing efforts to stop the spread of COVID-19, the pre-bid meeting for the Irene Waste Rock Consolidation Project will be conducted according to state and/or local safety protocols applicable at the time of the prebid. An amendment to this bid will be processed if special requirements are required. Currently there are no COVID protocols for level Green outdoor events of less than 500 people, however masking and social distancing is encouraged. Unless there are extraordinary circumstances for which the Purchasing Director may approve a bid received after the time and date due it will be rejected per R-24-103-202a-07(a), Colorado Procurement Code and Rules. The right is reserved to waive informalities and to reject any Bid.

Award

Municipal

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
998
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2021

August 30, 2021

img_map_placeholder

Multiple Locations, Denver, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.