BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 1, 2021 at 8:00 PM

Updated February 13, 2024

Site work and paving for a mixed-use development in Peoria, Arizona. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of September 1, 2021. The project has been awarded with the amount of $2,494,780.50. This project is located in the City of Peoria. The limits of improvements include the North 75th Avenue corridor between West Cholla Street to West Thunderbird Road. The work consists of replacing the existing 8-inch and 12-inch waterlines primarily asbestos cement pipes (ACP) with a new 16-inch waterline. Work will also include several jack and bore operations at SRP Irrigation crossings. As part of the waterline improvements work, restorations will be required for the removal and replacement of pavement, curb, gutter, landscaping, signing, and pavement marking, as shown in the project plans and as required to fully restore existing improvements that will be impacted by the proposed waterline construction. The work described in these Technical Special Provisions and shown on the plans for this project shall be performed in accordance with the current City of Peoria Engineering Standard Manual and Uniform Standard Details Supplement, Maricopa Association of Governments (MAG) Uniform Standard Specifications for Public Works Construction, City of Peoria amendments, and these special provisions. Questions Due Date: Jul 1st 2021, 6:00 PM MST

Award

Water / Sewer

$2,494,781.00

Public - City

Paving, Site Work

29

6

6

14

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
48
Bidding Soon
1,176
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2021

August 12, 2021

Project location map

N 75th Ave, Peoria, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.