Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 9, 2022 at 8:00 PM
Updated September 14, 2023
Site work and renovation of a water / sewer project in Peoria, Arizona. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
As of August 9, 2022, this project is included in the City of Peoria’s FY 2023-2032 CIP. An engineer has been selected for the project. Information regarding the contractor selection has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: The City of Peoria is seeking an experienced design consultant to perform design services and construction administration services for the rehabilitation of the existing raw water Central Arizona Project (CAP) Canal booster pump station. Questions Due Date: Jun 21st 2021, 12:00 PM The method of contractor selection has not been determined at this time.
Conceptual
Water / Sewer
$3,359,950.00
Public - City
Renovation, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 2, 2023
To Be Determined, Peoria, AZ
Related To This Project
Peoria, AZ
Bid Date: Aug 04 2020
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
