Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 20, 2023 at 8:00 PM
Updated November 15, 2023
Site work and new construction of a pre-engineered storage facility in Dongola, Illinois. Completed plans call for the construction of a 54,775-square-foot, three-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.
PROJECT DESCRIPTION: Dongola: Demolish an existing building and construct a new maintenance building. Construction includes a new engineered post frame building with concrete footings and foundation walls, slab on grade, gypsum board and metal stud partitions, hollow metal doors and frames, aluminum doors and frames, acoustical ceiling tiles systems, plastic laminate clad cabinets, painting, resilient base, and related site, plumbing, ventilating, and electrical work. Carbondale: Demolish the existing stair to the south entry of the District 9 Headquarters building and construct a new stair/ramp with guardrails and handrails. Remove select existing guardrail and handrails on District 9 site and replace with new guardrails and handrails
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$2,000,000.00
Public - State/Provincial
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2023
November 20, 2023
Multiple Locations, Dongola, IL
Related To This Project
Dongola, IL
Bid Date: Jan 12 2022
Dongola, IL
Bid Date: Nov 15 2021
Dongola, IL
Bid Date: Mar 25 2022
Dongola, IL
Bid Date: Jun 05 2024
Dongola, IL
Bid Date: Mar 11 2025
Dongola, IL
Bid Date: Mar 24 2025
Dongola, IL
Bid Date: Oct 30 2025
Dongola, IL
--
Dongola, IL
Bid Date: Apr 04 2023
Dongola, IL
Bid Date: Jun 28 2022
Dongola, IL
Bid Date: Jun 24 2022
Dongola, IL
Bid Date: Apr 26 2022
Dongola, IL
Bid Date: May 20 2022
Dongola, IL
Bid Date: Dec 30 2022
Hoopeston, IL
Bid Date: Oct 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
