BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a civil project in Gardnerville, Nevada. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

GRGID intends to replace approximately 20,000 lineal feet of existing 12-inch diameter water main in the south District under Phase 1 of a multi-phase pipeline replacement program. The pipeline replacement program will replace all of the existing asbestos-cement pipe (Phase 1) and schedule 40 PVC pipe (future phases) in the south District. The project will include traffic control, public outreach, underground utilities, pavement patching, minor grading, and miscellaneous site improvements to support and complete the overall project. The preconstruction phase of this public work will involve a review of constructability, project phasing and possible value-engineering opportunities. The preconstruction phase of the project is anticipated to commence in August of 2021 and extend through November of 2021. Construction activities will involve replacing the existing 12-inch asbestos cement pipe (ACP) that presently serves as the backbone water main for the south District. This includes trenching, excavation, backfill screening, traffic control, AC repair (trench patch only), installation of new valves, hydrants, and appurtenances, as well as testing, disinfection, and transitioning the water system over to the new 12-inch main. Construction is anticipated to commence in winter of 2021 and be constructed over four to five months. The following phases of the pipeline replacement program are anticipated to occur over the next 3 to 5 years.

Award

Water / Sewer

$4,500,000.00

Public - City

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
17
Bidding Soon
379
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2021

August 2, 2021

Project location map

Multiple Locations, Gardnerville, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.