BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Springfield, Illinois. Completed plans call for site work for a water / sewer project.

PROJECT DESCRIPTION: BASE BID: Public Affairs Center, which was dedicated in 1980, is a 198,572 s.f., 5-story masonry shell concrete university building. Scope of work includes remove and replace domestic hot, cold and hot return water, sanitary and vent piping. Remove and replace existing wall and floor finishes as required for piping access. Provide new lay-in ceilings in various areas. Asbestos flooring removal in various areas. ALTERNATE BID NO. G-1: Student Life Building, which was dedicated in 1970, is a 24,932 s.f., single-story steel framed university building. Scope of work includes remove and replace domestic hot, cold and hot return water, sanitary and vent piping. Remove and replace existing wall and floor finishes as required for piping access. Asbestos flooring removal in various areas. ALTERNATE BID NO. G-2: Student Affairs Building, which was dedicated in 1970, is a 18,623 s.f., single- story steel framed university building. Scope of work includes remove and replace domestic hot, cold and hot return water, sanitary and vent piping. Remove and replace existing wall and floor finishes as required for piping access. Asbestos flooring removal in various areas. Single Prime Delivery Method: Either the Single Prime Bidder or a protected subcontractor must be listed for each trade provided on the Bid Form. Only one protected subcontractor may be listed for each trade. Failure to identify the name and bid proposal cost of each listed protected subcontractor on the provided Bid Form or providing more than one protected subcontractor for each trade will be a material deficiency (no time will be allowed after bid opening to remedy deficiency) and will result in the rejection of the bid. All protected subcontractors listed must be prequalified with CDB in accordance with CDB Standard Documents for Construction. COST RANGE under $55,000,000

Bid Results

Water / Sewer

$4,203,594.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

10

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
30
Bidding Soon
555
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

December 30, 2024

img_map_placeholder

1 University Dr, Springfield, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.