BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Columbia Falls, Montana. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and water / sewer project.

Estimated Price Range: Between $10 million and $15 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Additional work on sites within or in the vicinity of the project may be requested by the CO. Such work generally will be in response to natural disasters. Provide cost proposals and perform work as ordered by the CO. To facilitate this contract, the CO offers to participate in a partnership with the Contractor. This partnership draws on the strengths of each organization to identify and achieve reciprocal goals. Partnering strives to resolve problems in a timely, professional, and non-adversarial manner. If problems result in disputes, partnering encourages, but does not require, alternative dispute resolution instead of the formal claim process. The objective is effective and efficient contract performance to achieve a quality project within budget and on schedule. Acceptance of this partnering offer by the Contractor is optional, and the partnership is bilateral. This memorandum provides the final structural pavement recommendations for the Lake McDonald roadway rehabilitation. The scope of the project has changed and additional information is provided in this memorandum. The Park has allocated additional funding to this roadway segment to provide a full rehabilitation of the roadway and address isolated shoulder widening to mitigate vehicle off tracking. The overall final elevation of the roadway will be decreased by 2 inches to facilitate the widening and provide an opportunity to address the roadway profile. A subgrade investigation was conducted in October 2019. Boring logs indicated existing asphalt concrete pavement depths between 6 to 9 inches, with the majority of the depths being 7 inches. The base and subgrade materials were described primarily as well graded gravel with sand and silty sand with gravel. These descriptions indicate good granular material to provide support for the pavement structure. The following are the recommended roadway structures. The project work is located approximately 40 miles northeast of Kalispell, MT in Glacier National Park along Going-to-the-Sun Road, Camas Road, and North McDonald Creek Road. Project Location and Type of Work - All project work is located in Glacier National Park, Flathead County, Montana. o North McDonald Creek Bridge Replacement. The work is to replace the existing bridge and approach with a new parabolic steel simple span bridge constructed and 2 stages, demolition of the existing bridge and construction of a new trailhead. Work is proposed to start in the Spring of 2022 and completed by the Spring of 2023. o Approximately 9 miles of GTSR Roadway along Lake McDonald for Milling, Full Depth Reclamation, Curve Enhancements, and Paving. The work proposed is to mill 9 inches of existing asphalt off the entire roadway, construct 25 curve enhancements, perform a Full Depth (6") Reclamation for the entire roadway, and pave back 6" of new asphalt. Work is proposed to start in the Spring of 2023 and completed in the Summer of 2023.

Bid Results

Bridges / Tunnels

$20,629,376.00

Public - Federal

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
3
Bidding Soon
49
All Active Projects
20
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

May 2, 2022

img_map_placeholder

Multiple Locations, Columbia Falls, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.