BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Sebastian, Florida. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of July 15, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2026. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Interview SR 5/US 1 NB Over Turnbull Creek Bridge Replacement TRC Members (Subject to Change) : Mark Trebitz Su Hao Tancredo Marte The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. Financial Management Number(s) 447117-1 - SR 5/US 1 NB OVER TURNBULL CREEK BRIDGE REPLACEMENT Shortlisted Firms will be provided with the RFP. Shortlisted firms must consult the RFP for actual Due Dates and Times. Tentative Forms, Org Chart or Staffing Chart, Resumes Due Date: 7/26/2021 Tentative Interview Date: 7/27/2021 Shortlist Selection Date/Time 7/12/2021 07:00 pm Technical Review Committee Meeting 1 Date/Time 7/27/2021 9:30 am Technical Review Committee Meeting 2 Date/Time 7/27/2021 11:30 am Technical Review Committee Meeting 3 Date/Time 7/28/2021 2:30 PM Final Selection Date/Time 8/09/2021 07:00 pm Negotiations Period Begin Date 8/13/2021 Negotiations Period Ending Date 10/06/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 5/US 1 NB Over Turnbull Creek Bridge Replacement

Conceptual

Bridges / Tunnels

$3,998,314.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
41
Bidding Soon
841
All Active Projects
366
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.