BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2022 at 7:00 PM

Updated November 14, 2023

Demolition, site work, renovation and addition to an educational facility in Everett, Washington. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

BP-05.1, $470,000, Steel Erection,* BP-05.2, $880,000, Steel Fabrication,* BP-06.1, $520,000, Casework & Finish Carpentry; BP-07.1; $740,000; Metal Panels, Siding & 'lashings; BP-07.2; $270,000; Roofing; BP-08.1, $310,000; Aluminum Window Systems & Glass; BP-09.1; $850,000; Metal Framing & GWB; BP-09.2; $240,000; Acoustical Ceilings And Treatments; BP-09,3; $70,000; Carpet; BP-09.4; $60,000; Resilient; BPo09.5; $80,000; Tiling; BP-09.6; $100,000; Painting, Coatings & Sealants; BP-21.1; $110,000; Fire Sprinklers; BP-22.1; $1,810,000; Mechanical; BP-26.1; $1,550,000; f!]lectr ical; BP-31.1; $2,110,000; Earthwork & Utilities; BP-31.2; $290,000; Storm Detention Vault; BP-32.1; $340,000; Asphalt Paving; BP-32.2; $380,000; Site Concrete; BP-32.3; $570,000; Landscape & i.rrigation Bidders of BP-05.1 and BP-05.2 may submit a combina-tion bid for both bid packages. Reference instructions to bidders BONDS: For all bids that exceed $300,000 a Performance and Payment Bond is required. Bid Bond in the amount of 5% of the total bid is required for ALL bids that exceed $300,000. TRADE UNIONS: Trade Contractor recognizes Cornerstone has an agreement with the fol-lowing union: Pacific Northwest. Regional Council of Carpenters. In accordance with RCW 39.10.380 Subcontractor Bidding Procedure, Trade Contractors shall be obli-gated and bound to such agree-ments for work claimed by the Carpenters Union. Should any of Trade Contractor work (includ-ing work of lower tier subcontrac-tors) be claimed by this Union, Subcontractor will enter into an agreement with this Union for performance of the claimed work on this project. SCOPE: See Section 002410 - General Scope of Work and Section. 0024E-3 Specific Scope of Work. NOTES: Cornerstone General Contractors Inc. is acting as a construction manager for the Mukilteo School District, not as a general contractor on this proj-ect. For this reason, all rules for public bidding must be followed by all contractors bidding these pack-ages. Bids must. be submitted as indicated in the Instructions to Bidders. Faxed bids, bids which are not on the proper bid thrill, and bids that do not fulfill the requirements of the Instructions to Bidders, cannot be accepted. All bids shall remain valid for a period of 90 calendar days.

Award

Educational

$570,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
94
Bidding Soon
1,789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2021

July 30, 2021

Project location map

11700 Meridian Ave, Everett, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.