BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2021 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Griffin, Georgia. Completed plans call for site work for a water / sewer project.

The approximate extent and character of the Work is generally described as follows: Installation of 26 new fire hydrants on existing water mains in various locations as designated by the Spalding County Water & Sewerage Facilities Authority. The time allowed for completion of the project is 120 calendar days.

Award

Water / Sewer

$208,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
110
Bidding Soon
2,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2021

August 9, 2021

Project location map

Multiple Locations, Griffin, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.