Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 6, 2021 at 8:00 PM
Updated November 15, 2023
Site work for a water / sewer project in Mount Dora, Florida. Conceptual plans call for site work for a water / sewer project.
As of August 06, 2021, this project was cancelled and will not re-bid. Be advised that dates, time, and locations are subject to change. Such changes will be posted on the City of Mount Doras and in the lobby of City Hall. The City of Mount Dora does not discriminate based on age, race, color, sex, religion, national origin, disability or marital status. The Work to be done consists of the furnishing of all labor, materials, and equipment, and the performance of all Work included in this Contract The Contractor shall furnish all labor, superintendence, materials, plant power, light, heat, fuel, water, tools, appliances, equipment, supplies, and means of construction necessary for proper performance and completion of the Work. The Contractor shall obtain and pay for all necessary local building permits. The Contractor shall perform and complete the Work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Engineer, and in strict accordance with the Contract Documents. The Contractor shall clean up the Work and maintain it during and after construction, until accepted, and shall do all Work and pay all costs incidental thereto. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the Work. b. The cost of incidental work described in these Project Requirements, for which there are no specific Contract Items, shall be considered as part of the general cost of doing the Work and shall be included in the prices for the various Contract Items. No additional payment will be made therefore. c. The Contractor shall provide and maintain such modern plant, tools, and equipment as may be necessary, in the opinion of the Engineer, to perform in a satisfactory and acceptable manner all the Work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy of his workmanship, materials, and equipment, prior approval of the Engineer notwithstanding Substantial completion is anticipated for no later than 150 days from the Notice to Proceed date. Project completion is to be thirty (30) days later at 180 days.
Project Abandoned
Water / Sewer
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 12, 2021
August 9, 2021
1600 Niles Rd, Mount Dora, FL
Related To This Project
Mount Dora, FL
Bid Date: Nov 30 2020
Mount Dora, FL
--
Mount Dora, FL
--
Mount Dora, FL
Bid Date: Oct 26 2023
Mount Dora, FL
--
Mount Dora, FL
Bid Date: Mar 07 2024
Mount Dora, FL
--
Mount Dora, FL
--
Mount Dora, FL
--
Mount Dora, FL
--
Mount Dora, FL
Bid Date: Oct 03 2023
Mount Dora, FL
Bid Date: Jun 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
