Demolition, site work, renovation and addition to a mixed-use development in Willoughby Hills, Ohio. Completed plans call for the addition of a 30,384-square-foot educational facility; for the demolition of a educational facility; for site work for a educational facility; for the renovation of a educational facility; laboratory facility; laboratory facility; 17,984-square-foot laboratory facility; and laboratory facility.

*A constructoin manager has not been selected as of June 16th, 2022. It is anticipated that the Engineering Building Project's construction efforts will involve a total of 30,384 gross square feet (gsf) of space. These construction efforts encompass: o Renovating 17,984 gsf of existing industrial lab space and related adjacent areas (hallways, classrooms), including several key infrastructure areas. The areas renovated include a construction management lab/workshop, shared materials testing lab, shared process simulator training lab, CNC machining center, CNC tooling & materials area, a ceramics workshop/ materials lab, and equipment storage and shared instruction space. o Additions and major renovation of 10,400 gsf (7,550 gsf of new additions and 2,850 gsf of major renovations). This includes a Fab "Hub" for 3D printing, a multi-functional fabrication center with controlled storage, and collaborative workspaces. o Repurposing adjacent outside space and create an exterior welding lab (2,000 gsf). This space will mimic onsite working conditions to prepare students for those employment situations. This project is also critical with implementing necessary objectives for enhanced safety, increased efficiency, and the protection and control of industrial materials and supplies. Design and engineering services were awarded to Hasenstab Architects, Akron, Ohio. Project construction will utilize the Construction Manager at Risk (CMR) methodology. We expect construction to commence in October 2022 and be completed by February 2024. Submit all questions regarding this RFQ in writing to Thomas A. Kirchner at tkirchner@lakelandcc.edu with the project number included in the subject line As of March 10 2022, a construction manager has not been awarded.

Post-Bid

Laboratories

$4,800,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
55
Bidding Soon
846
All Active Projects
353
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2021

August 1, 2022

img_map_placeholder

7700 Clocktower Dr, Willoughby Hills, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.