Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a civil project in Petaluma, California. Design plans call for the construction of a bridge / tunnel; for site work for a road / highway; and for paving for a road / highway.
The Caulfield Crosstown Connector, also known as the "Southern Crossing," has been proceeding through preliminary design in FY 21-22. Initial project efforts determined bridge type, bridge layout, and estimated construction costs for a new structure over the Petaluma River extending from Caulfield Lane to Petaluma Blvd. South near the Hwy 101 bridge at the southern end of the City. The preliminary design concept has received U.S. Coast Guard approval for vertical and horizontal clearances over the navigable waterway and bridge openings. The design and layout have been developed to 10% complete and now the project can proceed into the environmental permitting phase. This planning/permitting phase will identify necessary permits and studies (i.e., traffic, cultural, biological), execute those studies, and provide detailed construction cost estimates for the work. Construction could be ready to start in FY 25-26, assuming that funding has been secured. Recent design efforts and flood modeling indicate that a two-leaf bascule bridge is needed instead of the originally planned single-leaf configuration, raising project cost estimates accordingly. This project is currently in the City of Petaluma's FY 2022-2027 CIP. Per the owner, as of July 13, 2022, a design team has been selected. The owner states that the project is not fully designed for construction bidding. A timeline for bidding and construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Bridges / Tunnels
$43,000,000.00
Public - City
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2023
To Be Determined, Petaluma, CA
Related To This Project
Petaluma, CA
--
Petaluma, CA
--
Petaluma, CA
Bid Date: Aug 02 2022
Petaluma, CA
Bid Date: Jun 09 2022
Petaluma, CA
Bid Date: Aug 03 2022
Petaluma, CA
--
Petaluma, CA
Bid Date: May 15 2023
Petaluma, CA
--
Petaluma, CA
Bid Date: May 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.