Published July 27, 2021 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Fullerton, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of July 13,2021. the project has not been awarded and no specific time frame provided at this time. Due to COVID-19 directives, City Hall is currently closed to the public. However, staff members will be present outside of City Hall starting at 2:00 p.m. and will remain onsite until after the bid opening is completed. It is highly recommended to arrive with sufficient time for bidders to be able to line up. Bidders coming to City Hall are required to wear appropriate face coverings per the City's Municipal Code and shall keep a minimum six (6) feet of separation while waiting in line to submit and during the bid opening process per the current social distancing guidelines. Bidders wanting to utilize delivery services (USPS, UPS, FedEx, etc.) or wanting to drop off bids outside the specified time window should make arrangements with City of Fullerton staff in advance. No Bid will be accepted unless it is made on a Bid Schedule form furnished by the Public Works Department, Engineering Division contained within the Specifications. Bids are required for the entire work as described below: The Work shall consist of, but not limited to: replacing concrete structures, including sidewalk, curb and gutter, cross gutter and spandrels, driveways, and access ramps; cold milling pavement and asphalt concrete overlay; pulverizing existing roadway section, constructing cement treated base, construction of new asphalt concrete pavement, adjustment of sewer manholes and water valve boxes, signing and striping, traffic control, water pollution control, and all related work. The time of completion of contract shall be fifty (50) working days as defined in the Standard Specifications for Public Works, 2018 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $1,000 per calendar day.

Award

Roads / Highways

$637,000.00

Public - City

Paving, Site Work

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
676
Active Projects
289
Bidding Soon
4,474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2021

September 8, 2021

Project location map

W Ash Ave, Fullerton, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed