BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Fullerton, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of July 13,2021. the project has not been awarded and no specific time frame provided at this time. Due to COVID-19 directives, City Hall is currently closed to the public. However, staff members will be present outside of City Hall starting at 2:00 p.m. and will remain onsite until after the bid opening is completed. It is highly recommended to arrive with sufficient time for bidders to be able to line up. Bidders coming to City Hall are required to wear appropriate face coverings per the City's Municipal Code and shall keep a minimum six (6) feet of separation while waiting in line to submit and during the bid opening process per the current social distancing guidelines. Bidders wanting to utilize delivery services (USPS, UPS, FedEx, etc.) or wanting to drop off bids outside the specified time window should make arrangements with City of Fullerton staff in advance. No Bid will be accepted unless it is made on a Bid Schedule form furnished by the Public Works Department, Engineering Division contained within the Specifications. Bids are required for the entire work as described below: The Work shall consist of, but not limited to: replacing concrete structures, including sidewalk, curb and gutter, cross gutter and spandrels, driveways, and access ramps; cold milling pavement and asphalt concrete overlay; pulverizing existing roadway section, constructing cement treated base, construction of new asphalt concrete pavement, adjustment of sewer manholes and water valve boxes, signing and striping, traffic control, water pollution control, and all related work. The time of completion of contract shall be fifty (50) working days as defined in the Standard Specifications for Public Works, 2018 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $1,000 per calendar day.

Award

Roads / Highways

$637,000.00

Public - City

Paving, Site Work

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
109
Bidding Soon
2,316
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2021

September 8, 2021

img_map_placeholder

W Ash Ave, Fullerton, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.