Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a transportation facility in Mesa, Arizona. Working plans call for site work for a transportation facility; and for paving for a transportation facility.
As of May 26, 2022 "Offerors are hereby notified that the Phoenix-Mesa Gateway Airport Authority has cancelled the above referenced Invitation For Bid." There will be plans to re-bid this project at a future date. The Taxiway W Rehabilitation project at Phoenix-Mesa Gateway Airport (PMGA) is intended to address the existing pavement distresses and failing pavement areas that were identified as part of a previous Pavement Inspection and subsequent Report. To mitigate the existing issues previously identified, it has been determined that portions of the existing Taxiway W pavements (a section at the south end of the taxiway, and a smaller section located near the Taxiway V intersection) will require full PCC panel replacements, and localized spall/patch/crack distresses will also be rehabilitated per the appropriate methodology, throughout Taxiway W, as shown in the Project Plans and details Every bid must be accompanied by a certified check, cashier check or surety bond for ten percent (10%) of the amount of the bid. The Contractor shall achieve Substantial Completion no later than a total of 100 Calendar Days from the date of issuance of the Notice to Proceed. 3.2.1 Base Bid (Phase 1A and Phase 1B) a. Phase 1A Substantial Completion - 32 Days b. Phase 1B Substantial Completion - 32 Days 3.2.2 Add Alt No. 1 (Phase 1C) a. Phase 1C Substantial Completion - 21 Days 3.2.3 Add Alt No. 2 (Phase 2) a. Phase 2 Substantial Completion - 15 Days The following Liquidated Damages apply: 1. Substantial Completion of Base Bid (Phase 1A and 1B, 64 Calendar Days) - $1,500 per Day 2. Substantial Completion of Add Alt No. 1 (Phase 1C, 21 Calendar Days) - $1,500 per Day 3. Substantial Completion of Add Alt No. 2 (Phase 2, 15 Calendar Days) - $1,500 per Day Final Completion within thirty (30) Calendar Days of Substantial Completion of the project - $1,500 per Day
Final Planning
Transportation Terminals
$2,081,551.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 24, 2022
December 8, 2022
6033 S Sossaman Rd, Mesa, AZ
Related To This Project
Mesa, AZ
Bid Date: Apr 27 2023
Mesa, AZ
Bid Date: Nov 10 2022
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
Bid Date: Aug 25 2021
Mesa, AZ
Bid Date: Apr 17 2020
Mesa, AZ
Bid Date: Nov 12 2020
Mesa, AZ
Bid Date: Oct 06 2022
Mesa, AZ
Bid Date: Oct 06 2022
Mesa, AZ
Bid Date: Nov 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.