BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Mesa, Arizona. Working plans call for site work for a transportation facility; and for paving for a transportation facility.

As of May 26, 2022 "Offerors are hereby notified that the Phoenix-Mesa Gateway Airport Authority has cancelled the above referenced Invitation For Bid." There will be plans to re-bid this project at a future date. The Taxiway W Rehabilitation project at Phoenix-Mesa Gateway Airport (PMGA) is intended to address the existing pavement distresses and failing pavement areas that were identified as part of a previous Pavement Inspection and subsequent Report. To mitigate the existing issues previously identified, it has been determined that portions of the existing Taxiway W pavements (a section at the south end of the taxiway, and a smaller section located near the Taxiway V intersection) will require full PCC panel replacements, and localized spall/patch/crack distresses will also be rehabilitated per the appropriate methodology, throughout Taxiway W, as shown in the Project Plans and details Every bid must be accompanied by a certified check, cashier check or surety bond for ten percent (10%) of the amount of the bid. The Contractor shall achieve Substantial Completion no later than a total of 100 Calendar Days from the date of issuance of the Notice to Proceed. 3.2.1 Base Bid (Phase 1A and Phase 1B) a. Phase 1A Substantial Completion - 32 Days b. Phase 1B Substantial Completion - 32 Days 3.2.2 Add Alt No. 1 (Phase 1C) a. Phase 1C Substantial Completion - 21 Days 3.2.3 Add Alt No. 2 (Phase 2) a. Phase 2 Substantial Completion - 15 Days The following Liquidated Damages apply: 1. Substantial Completion of Base Bid (Phase 1A and 1B, 64 Calendar Days) - $1,500 per Day 2. Substantial Completion of Add Alt No. 1 (Phase 1C, 21 Calendar Days) - $1,500 per Day 3. Substantial Completion of Add Alt No. 2 (Phase 2, 15 Calendar Days) - $1,500 per Day Final Completion within thirty (30) Calendar Days of Substantial Completion of the project - $1,500 per Day

Final Planning

Transportation Terminals

$2,081,551.00

Public - City

Paving, Site Work

9

17

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
42
Bidding Soon
1,055
All Active Projects
443
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.