BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Bay Harbor Islands, Florida. Completed plans call for site work for a bridge / tunnel.

The Town of Bay Harbor Islands is seeking a qualified contractor to provide services to remove the existing conduit, bracketing and medium-voltage (7.2kv) three-phase power cables and replace with approximately 1,000 feet of new conduit, bracketing and cables to supply electrical service to the Bascule bridge and the Chevron fuel station, just west of the Bridge. d. Inquiries regarding this contract may be emailed to the Town's Design Engineer, Arturo Espinosa: aespinosa@bcceng.com. The nature and scope of this contract are as follows: The proposed repair would install a brand-new conduit made of PVC Schedule 80, with a 3.5" trade-size. The new conduit would be supported by stainless steel brackets, installed at the bottom flange of the metal I-Girder. The spacing of the support brackets would be 5 Ft. FPL has been contacted about this situation and are waiting for the bridge owner/operator to install the new conduit and new 3-phase MV 7.2kv # 1/0 AWG cables. The existing cables have been stressed under the load of their own weight and therefore, calls for the entire 1,000 Ft run of cable to be replaced. Once accomplished, FPL will proceed with the re-splicing of the new cables into their system, at the Island's FPL MV pull box. The proposed conduit system mounts on the metal I-Girder of the bridge, hence it does not require any drilling into the bridge's concrete, which, built in 1950, may contain asbestos. The Town reserves the right to cancel this solicitation, reject any or all submissions, with or without cause, to waive technical errors and informalities, and to accept any bid from a bidder who is qualified and best serves the interests of or represents the best value to the Town. This contract has been awarded to A. West Enterprise, LLC in the amount of $172,808.08.

Award

Bridges / Tunnels

$172,808.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
45
Bidding Soon
1,090
All Active Projects
483
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2021

August 20, 2021

img_map_placeholder

To Be Determined, Bay Harbor Islands, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.