BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Seatac, Washington. Completed plans call for the renovation of a transportation facility.

For RFQ D/B - Alaska North Main Terminal Redevelopment Project - Project Manager Baggage Improvements The purpose of this Request for Qualifications is to select the best-qualified individual, firm, or team to provide project management with design-build experience and installation experience delivering upgrades and modifications to an existing airport baggage handling (B.H.S.) system. The ideal candidates will be responsible for representing Alaska Airlines in planning, coordinating, implementing, or overseeing the design-build portion of the B.H.S. system of the N.M.T.R.Project. They will also effectively monitor and present project updates to Alaska Airlines, the Port, and the project team. The candidate location is flexible but will need to be on-site, full time during the construction activation phase of the project. All questions must be submitted in writing to Michael Francis through email at Michael.francis@bcciconst.com. Consultant shall bear all costs in preparing its proposal. Owner may reject Consultant's proposal for any reason whatsoever. Consultant, to the extent it deems appropriate, shall visit the work site and determine (before submitting its proposal) the nature of all existing conditions and all requirements affecting the Professional Services to be provided The "Project" is defined as the final or total product to be constructed/achieved. Consultant's portion of the Project shall be the scope of work set out in Section 4 above. b. Consultant agrees to revise, change, or amend the plans, specifications, reports, and documents it prepares when requested by Owner, if such revisions are not outside the agreed scope of work. c. If Owner requests appreciable changes in the Project or the Professional Services and Consultant believes an adjustment in cost or time is appropriate therefor, Consultant shall immediately so notify Owner in writing. Consultant shall not be entitled to such adjustments unless the same are expressly approved in writing by Owner. d. Unless otherwise agreed in writing, the cost of approved changes shall be based upon the rates of compensation set forth in the Order

Post-Bid

Transportation Terminals

$760,000.00

Public - City

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
33
Bidding Soon
870
All Active Projects
359
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2021

March 1, 2022

img_map_placeholder

17801 International Blvd, Seatac, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.