BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Afton, Minnesota. Completed plans call for site work for a road / highway.

As of December 28 2021 this project was awarded and completed. The Work consists of furnishing all labor, materials, equipment, skills, and performing all operations required to construct the Work. The Work includes, but is not limited to, mobilization and demobilization; furnishing, installing, maintaining, and removing temporary erosion control facilities; clearing, grubbing, tree removal, and tree protection; soil excavation, disposal and grading; furnishing and installing storm sewer and manhole outlet structures; furnishing and installing riprap; furnishing and installing rock filter dikes; furnishing and installing permanent erosion control facilities including erosion control blanket, hydromulch, and turf reinforcement mat; furnishing and installing seeding and plantings; all as provided for in the Bidding Documents. All quantities and work items in this advertisement for bid are approximate and are not guaranteed. Neal Avenue South and Valley Creek Trail, Afton, MN A contractor responding to this solicitation document shall submit to the Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes section 16C.285 subdivision 4.

Occupancy

Roads / Highways

$244,418.00

Public - County

Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
84
Bidding Soon
823
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2021

December 2, 2021

img_map_placeholder

Valley Creek Trail & Neal Ave S, Afton, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.