BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a data center facility in Key West Nas, Florida. Completed plans call for the construction of a data center facility; and for site work for a data center facility.

**As of Aug 4, 2021 project was awarded to Sirius Computer Solutions, Inc. in the Total Estimated Amount of $312,893.24, and Surplus Existing Equipment. The start and completion date as not yet determined. Specifications for Data Center Infrastructure Question End Date 6/25/2021 12:00 PM Piggyback Solicitation No Insurance Required Yes Bid Bond Required Yes Bid Bond Amount 5% Performance Bond Required Yes KEYS reserves the right to reject any or all proposals, to waive irregularities and informalities in any or all proposals, and to separately accept or reject any item, items, bid schedule or bid schedules of the proposal which KEYS deems to be in the best interest of the Utility Board. SCOPE OF WORK While KEYS has tried to anticipate all Work required under and during the term of this contract, the parties understand and agree that the Work required herein may require without notice to contractor, the performance of Extra Work or the omission of Work previously required. KEYS may at any time and without notice to contractor, require changes in the scope of Work under this contract as KEYS may find necessary or desirable. Such changes may include the omission of Work previously required. A. KEYS shall notify contractor of the change in scope work via Change Order, which shall become part of the Contract Documents. If a Change Order directs Contractor to omit Work, contractor shall refrain from performing it. B. Contractor shall perform Extra Work only pursuant to the issuance by KEYS of Change Order. Records of any Extra Work performed by contractor shall be reviewed daily by contractor and KEYS, duplicate copies of accepted records made and signed by both contractor or his representative and KEYS, and one (1) copy retained by each

Award

Data Centers

$312,893.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
28
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2021

August 9, 2021

img_map_placeholder

To Be Determined, Key West Nas, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.