Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 15, 2021 at 8:00 PM
Updated May 15, 2026
Site work and paving for a road / highway in St George, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Mobilization, Demobilization, Temporary Facilities, Administrative Items, Material Testing, and Public Information. This includes all cost, labor, equipment, and materials associated with this project not specifically covered in the bid items below. This also includes the cost of quality control, material testing, obtaining permits needed for construction, and Public Information. The Public Information provided by the Contractor will consist of contacting businesses or homes that front or access their property from the project and notifying them of the construction schedule prior to construction. Traffic Control and Coordinate Striping with the St. George City Crews. This includes all cost, labor, equipment, and materials needed to set up, maintain, and remove Traffic Control. The traffic control shall meet MUTCD Standards. St. George City Crews will provide striping after placement of the slurry if necessary. This item also includes the cost of coordinating striping with the City and leaving the traffic control and/or tabbing in place until the final striping is placed up to 14 days. Cleaning. This includes all cost, labor, equipment, and materials required to thoroughly clean the existing asphalt surfaces prior to placing the slurry seal on the asphalt surface in accordance with the plans and specifications. Contractor will be paid for one cleaning only. Cleaning cannot be completed more than 72 hours prior to slurry application. Type II Slurry. This includes all cost, labor, equipment, and materials needed to apply Slurry to the existing asphalt. This item includes preparing the roadway, roughing of pavement markings (no roughing / removal of lane striping required), stop bars, cross walk and stop bar markers. This item includes the covering and protection of manholes and concrete collars, valve boxes and concrete collars, survey monuments and concrete collars, etc. during slurry application. Minimum application rate 17#/sq. yd. Completed on or before October 22, 2021. Main Street - Tabernacle to Bluff Street Type II Slurry. This includes all cost, labor, equipment, and materials needed to apply Slurry to the existing asphalt. This item includes preparing the roadway, roughing of pavement markings (no roughing / removal of lane striping required), stop bars, cross walk and stop bar markers. This item includes the covering and protection of manholes and concrete collars, valve boxes and concrete collars, survey monuments and concrete collars, etc. during slurry application. Minimum application rate 17#/sq. yd. Completed on or before August 15, 2021.
Award
Roads / Highways
$487,200.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2021
August 2, 2021
Multiple Locations, St George, UT
Related To This Project
St George, UT
Bid Date: May 07 2026
St George, UT
--
St George, UT
--
St George, UT
--
St George, UT
--
St George, UT
--
St George, UT
--
St George, UT
Bid Date: Apr 28 2026
St George, UT
Bid Date: Apr 28 2026
St George, UT
Bid Date: Mar 31 2026
St George, UT
--
St George, UT
--
St George, UT
Bid Date: Mar 02 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
