Published July 15, 2021 at 8:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in St George, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Mobilization, Demobilization, Temporary Facilities, Administrative Items, Material Testing, and Public Information. This includes all cost, labor, equipment, and materials associated with this project not specifically covered in the bid items below. This also includes the cost of quality control, material testing, obtaining permits needed for construction, and Public Information. The Public Information provided by the Contractor will consist of contacting businesses or homes that front or access their property from the project and notifying them of the construction schedule prior to construction. Traffic Control and Coordinate Striping with the St. George City Crews. This includes all cost, labor, equipment, and materials needed to set up, maintain, and remove Traffic Control. The traffic control shall meet MUTCD Standards. St. George City Crews will provide striping after placement of the slurry if necessary. This item also includes the cost of coordinating striping with the City and leaving the traffic control and/or tabbing in place until the final striping is placed up to 14 days. Cleaning. This includes all cost, labor, equipment, and materials required to thoroughly clean the existing asphalt surfaces prior to placing the slurry seal on the asphalt surface in accordance with the plans and specifications. Contractor will be paid for one cleaning only. Cleaning cannot be completed more than 72 hours prior to slurry application. Type II Slurry. This includes all cost, labor, equipment, and materials needed to apply Slurry to the existing asphalt. This item includes preparing the roadway, roughing of pavement markings (no roughing / removal of lane striping required), stop bars, cross walk and stop bar markers. This item includes the covering and protection of manholes and concrete collars, valve boxes and concrete collars, survey monuments and concrete collars, etc. during slurry application. Minimum application rate 17#/sq. yd. Completed on or before October 22, 2021. Main Street - Tabernacle to Bluff Street Type II Slurry. This includes all cost, labor, equipment, and materials needed to apply Slurry to the existing asphalt. This item includes preparing the roadway, roughing of pavement markings (no roughing / removal of lane striping required), stop bars, cross walk and stop bar markers. This item includes the covering and protection of manholes and concrete collars, valve boxes and concrete collars, survey monuments and concrete collars, etc. during slurry application. Minimum application rate 17#/sq. yd. Completed on or before August 15, 2021.

Award

Roads / Highways

$487,200.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
122
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.