BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a civil project in Oceanside, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Per the Contracts Administrator award information will not be available till February 2022 The project consists of designing and constructing the El Corazon Lift Station and the Oceanside Mesa Garrison Force Main, and replacements to portions of the Mission Avenue Lift Station Force Main. Replacement of the portions of Land Outfall is optional scope items to be determined at the City's discretion. The PROJECT consists of the design and construction of the ECLS and the OMG Force Main. Replacements to portions of the MALS Force Main and Land Outfall are options scope items to be determined at the City's discretion. The PROJECT is anticipated to have a construction cost ranging from $75 to $90 Million. Provided below is a summary of each component of the PROJECT from north to south. Figure 1 presents the location of the PROJECT. The selected Design-Builder will be responsible for developing the final scope and costs. 1) Approximately 15,000 feet of 36" OMG Force Main from SLRWRF to the existing Tunnel. 2) Approximately 15,000 feet of 36" Land Outfall from SLRWRF to the existing Tunnel. (Optional) 3) Approximately 10,000 feet of 24" MALS Force Main from SLRWRF to MALS. 4) Tie in of OMG Force Main to existing 36" Combined Force Main prior to Tunnel(north-end). 5) Tie in of new Land Outfall to existing 24" Land Outfall prior to Tunnel (north-end) (Optional). 6) Miscellaneous piping and valving to convert existing slip-lined Gravity Main through Tunnel into New Pressurized 22" HDPE Bypass Pipeline 7) No work to be performed in the Tunnel. All questions and requests for information related to the Request for Qualification (RFQ) must be submitted via email as soon as possible but no later than Tuesday, July 6, 2021 at 4:00 PM. Answers to relevant questions will be issued via an addendum to the RFQ. No answers will be given on an individual basis, and oral and telephonic inquiries will not receive a response. All the questions should be submitted electronically via email to the two (2) CITY contacts provided below: Mabel Uyeda - muyeda@oceansideca.org Kirill Dolinskiy - kdolinskiy@oceansideca.org The PROJECT is anticipated to have an overall cost ranging from $75 to $95 Million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Approximately 1,000 feet of new 30" Force Main from Existing 36"/42" Force Main at Mesa Drive and Garrison Street to ECLS. New ECLS, with ability to pump approximately 5 million gallons per day (mgd), expandable to 7 mgd. The anticipated method of pump operation is constant speed. The CITY anticipates that the immersible pumps will be chopper pumps in a dry-pit installation arrangement. All questions and requests for information related to the Request for Qualification (RFQ) must be submitted via email as soon as possible but no later than Tuesday, July 13, 2021 at 4:00 PM. All questions and requests for information related to the Request for Qualification (RFQ) must be submitted via email, as soon as, possible but no later than Friday, July 23, 2021 at 4:00 PM. All questions and requests for information related to the Request for Qualification (RFQ) must be submitted via email, as soon as, possible but no later than Tuesday, July 27, 2021 at 4:00 PM. (909157319722, 909163920722, 909164010722, and 909954800722)

Post-Bid

Water / Sewer

$95,000,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

122 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
105
Bidding Soon
2,321
All Active Projects
1,041
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2022

May 13, 2022

img_map_placeholder

Multiple Locations, Oceanside, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.