EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2021 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Hatfield, Pennsylvania. Completed plans call for site work for a water / sewer project.

The project includes the replacement of approximately 850 linear feet of 8-inch VCP sanitary sewer within Orchard Lane and Forest Way with 8-inch SDR-26 PVC pipe. The project also includes removing, replacing and reconnecting approximately fifteen sanitary sewer laterals as well as the removal and replacement of three sanitary sewer manholes. Each document shall be accompanied by a certified check or bank draft, payable to the order of the Borough of Hatfield, negotiable U.S. Government Bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to ten percent (10%) of the total bid amount. Bids shall remain open for a period of 90 days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. Bids may not be withdrawn during this period. All Bidders must bid on all items listed on the Bid Form. The successful Bidder shall be required to furnish satisfactory Performance and Payment Bonds in the amount of 100% of the Contract Price and a Maintenance Bond in the amount equal to fifteen (15%) of the Contract amount thereafter required on the specified Bond Forms included in the Contract Documents and Waiver of Lien. The successful Bidder shall substantially complete the project within 90 calendar days of receipt of Notice to Proceed and shall be ready for final payment within 120 days of receipt of Notice to Proceed. This Contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, which provides that training, employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing. This contract is subject to the following the Federal Occupational Safety and Health Act of 1970 (OSHA) conditions; the Pennsylvania Act 229 of 2002; the Pennsylvania One Call Act, also known as the Underground Utility Line Protection Law, Act 287 of 1974, as amended; the Pennsylvania Human Relations Act 222 Conditions; and the non-discrimination in Employment/Contract Compliance Regulations Conditions. Attention is called to the fact that not less than the minimum salaries and wages set forth in the Contract Documents must be paid on this project, in accordance with the Pennsylvania Prevailing Wage Act, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Hatfield Borough reserves the right to reduce the scope of this project based upon the availability of funding. The Borough also reserves the right to accept or reject any or all Bids. The Borough also reserves the right, in its sole discretion, to waive bid defects which is deemed most favorable to the Owner, at the time and under the circumstances stipulated. Requests for clarification are due Tuesday, July 6, 2021 4:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. The notice to proceed is anticipated to be issued on 8/19/21, with a 75 day (11/2/21) substantial completion and 105 day (12/2/21) ready for nal payment term. What is the anticipated Notice to Proceed date / construction start date 8/19/21 Anticipated Notice to Proceed: August 18, 2021

Award

Water / Sewer

$342,050.00

Public - City

Site Work

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Concrete Curing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving Surface Treatment, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
480
Active Projects
249
Bidding Soon
4,335
All Active Projects
2,004
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2021

August 18, 2021

img_map_placeholder

Forrest Way & Orchard Ln, Hatfield, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Orchard Lane & Forest Way Sanitary Sewer Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.