BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Creston, Iowa. Completed plans call for the construction of a water / sewer project; for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

*As of August 30, 2021, a general contractor has been awarded. The extent of the WORK involved consists generally of: DIVISION 1: SIRWA WATER TREATMENT PLANT: Furnish all labor, materials, equipment and incidentals for the construction of a complete and operating new 6 mgd water treatment plant on an open site, including a water treatment building with attached administration building, a chemical/shop building, water storage tank structures, earthen sludge lagoons, site grading, site paving, and site utilities. All Division 1: SIRWA Water Treatment Plant WORK and materials are to be in strict compliance with DRAWINGS and SPECIFICATIONS prepared by HDR Engineering, Inc. of Des Moines, Iowa, which, together with the proposed form of CONTRACT and ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST have heretofore been approved by the OWNER and are now on file and are by this reference made a part of the CONTRACT DOCUMENTS as though fully set out and incorporated herein. The Division 1 CONTRACT DOCUMENTS may be examined at the following locations: Southern Iowa Rural Water Association HDR 1391 190th Street 300 E. Locust Street, Suite 210 Creston, Iowa 50801 Des Moines, Iowa 50309-1823 All BIDS must be filed in said office before the time herein set, on forms furnished by the OWNER, and must be enclosed in a sealed envelope and plainly identified. Bids shall contain no condition except as provided in the specifications. BIDDER accepts that failure to submit a fully completed Bidder Status Form may result in the BID being deemed non-responsive and rejected. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract at the prices BID for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the OWNER, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract, and the required Certificate of Insurance. The bidder's security shall be in the form of a BID BOND, certified check, cashier's check, or certified credit union share draft in a sealed envelope in an amount equal to ten per cent (10%) of the total amount of the BID. If BID BOND is submitted, it must be on the form provided with the CONTRACT DOCUMENTS. The certified check, cashier's check, or certified credit union share draft shall be drawn on a bank in Iowa, a bank chartered under the laws of the United States of America, or said certified share draft shall be drawn on a credit union in Iowa or chartered under the laws of the United States and payable to the Treasurer of the OWNER. The certified check, cashier's check, or certified share draft may be cashed, or the BID BOND forfeited, and the proceeds retained as liquidated damages if the BIDDER fails to execute a contract or file acceptable PERFORMANCE AND PAYMENT BONDS or provide an acceptable Certificate of Insurance within fifteen (15) days after the acceptance of said BID by resolution of the OWNER. No BIDDER may withdraw a BID within sixty (60) days after the date set for opening BIDS. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by the OWNER and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the OWNER from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two years from and after acceptance of the contract. Building materials, supplies, and equipment incorporated into said improvement are exempt from Iowa Department of Revenue and Finance sales tax and any applicable local option sales tax and school infrastructure local option sales tax pursuant to Iowa Code Sections: 423.3 (37), 423.3 (38), 423.45 (4), and Iowa Administrative Code 701 -17.33. Bidder shall not include payment of Iowa sales tax in Bid; Bidder shall include all other applicable fees and taxes in Bid. Owner will provide Purchasing Agent Authorization Letter and Designated Exempt Entity Iowa Construction Sales Tax Exemption Certificate to Contractor for use by Contractor and Subcontractors. Contractor shall coordinate sales tax exempt purchases with subcontractors and material and equipment suppliers. Contractor shall maintain records identifying the materials purchased sales tax exempt and maintain records verifying the use of said materials on said improvement by Contractor and Subcontractors. Payment of the said WORK will be made in cash to be derived from the proceeds of grant and loan funds available and/or such other funds as may be lawfully used for said purpose. Except as provided in Chapter 26 of the Code of Iowa, payment will be made in monthly estimates and one final payment. Payment for the WORK completed during the preceding calendar month will be determined by the Engineer / Architect pursuant to the GENERAL CONDITIONS and in accordance with the provisions of Chapter 573 Code of Iowa. Except as provided in Chapter 26 of the Code of Iowa, upon acceptance by the OWNER, the final payment will be issued on the balance found to be due the CONTRACTOR, including the retained percentages, but except such sums as may be lawfully retained by the OWNER, and shall not be paid to the CONTRACTOR earlier than thirty-one (31) days after the OWNER'S Final Acceptance of the WORK. The WORK under the CONTRACT for each portion of the WORK shall commence on or before the date specified in a written NOTICE TO PROCEED and shall be completed and as follows: DIVISION 1: SIRWA WATER TREATMENT PLANT - The WORK shall be substantially complete within 790 days after the date when the Contract Times commence to run, and completed and ready for final payment within 850 days after the date when the Contract Times commence to run. Bidder accepts the provisions of the Agreement as to Liquidated Damages of $3,600 per day for Division 1, substantial completion; $3,600 per day for Division 1, final completion; By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor to the extent lawfully required under Iowa Statutes, providing that the award of the CONTRACT for each portion of the WORK will be made to the lowest responsive/responsible BIDDER submitting the lowest acceptable BID for the portion of the WORK included in the BID, which shall be without regard to state or local law whereby preference is given on factors other than the amount of the BID. Each successful Bidder will be required to furnish a PERFORMANCE BOND acceptable to the OWNER on forms provided in the specifications. The Owner hereby reserves the right to reject any or all BIDS, to waive informalities and irregularities and to enter into such contracts as it may deem to be for the best interests of the OWNER.

Award

Water / Sewer

$39,800,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
36
Bidding Soon
446
All Active Projects
231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2021

October 11, 2021

img_map_placeholder

To Be Determined, Creston, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.