BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Colorado Springs, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Region: 2 Counties: El Paso Multiple I-25 on-ramps Between Mm 148 and Mm 158 Construct pavement widening and ramp metering signals along I-25 and the southbound Woodmen on-ramp, northbound and southbound Academy on-ramps, and northbound North Gate on-ramp. Work includes removals of existing pavement, signing, striping, ITS and conduit related work, guardrail and minor structure work, erosion control and landscaping, and other incidental operations. The project is located in Region 2 in El Paso County on I-25 for ramp pavement widening and ramp metering signals for Southbound Woodmen, Northbound and Southbound Academy, and Northbound North Gate on-ramps. Work includes removal and installation of pavement, signing, striping, ITS and conduit work, guardrail and minor structure work, erosion control and landscaping. For any project questions please contact John Hall at 719-321-8748 or by email at john.hall@state.co.us. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 (X) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CDOT - 001 - Construct Pavement Widening and Ramp Metering Signals Along I-25 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Per the Project Special Provision Commencement and Completion of Work (Floating Start Date),"The Contractor shall complete all work 100 working days in accordance with the "Notice to Proceed." The Contractor is advised that Integration and Testing is assumed to be 20 working days and this shall be part of the charged time, including liquidated damages if not completed within the total contract time. All paving operations are intended to be completed prior to September 30, 2022." This does not preclude that all testing and integration will be completed within a 20 working day window. Other project activities not in conflict with testing and integration can be completed concurrently with testing and integration. Testing should follow the specifications and meet the minimum burn in times set forth in the project special provisions. Project No.: IM 0252-490

Award

Roads / Highways

$4,148,547.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
85
Bidding Soon
1,370
All Active Projects
564
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 4, 2021

January 3, 2022

September 30, 2022

img_map_placeholder

I-25, Colorado Springs, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.