EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2021 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Woodstock, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of August 18, 2021, project has been awarded in the amount of $2,817,466.92. The work to be done consists of the furnishing of all materials, labor, and equipment for the complete construction of the Hub Transformation Project, hereinafter referred to as the PROJECT, including, but not limited to, erosion control, maintenance of traffic, paving, grading, excavation, subgrade preparation, drainage construction, wall construction, concrete surface course, sidewalks, signs, pavement marking, and grassing at locations indicated in the plan set. The contract timeframe is 540 calendar days. Payment will be made to the Contractor each calendar month based on the estimated work completed and in place as described by the standard specifications. Final payment of amounts withheld or deposited in escrow will not be made until the City of Woodstock, Georgia has certified that the work has been satisfactorily completed and accepted. Deadline for questions will be Tuesday, July 20th, at Noon. Responses to questions will be provided by Thursday, July 22nd, at 4:00 pm. All bidders shall be prequalified with the Georgia Department of Transportation prior to submission of the bid. Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. City of Woodstock, Georgia 12453 Highway 92 Woodstock, Georgia, 30188. Georgia reserves the right to reject any one or all bids and to waive formalities. The Grounds Maintenance Agreement is to include the complete care and guarantee of all planted trees, plants, groundcovers, within the limits of work shown within the roundabout and construction plans for the City of Woodstock. The owner shall be insured of a complete maintenance program and plant guarantee for all trees, plants, and mulched areas such that the quality of planting does not deteriorate, but obtains vitality and healthy new growth for the duration of the agreement. The grounds maintenance contractor must take every precaution to prevent saturation of the plant material during the life of the agreement (i.e., diversion swales, if needed, removal of mulch and tree saucers when necessary, and/or raising distressed plant material when necessary).

Award

Roads / Highways

$2,817,467.00

Public - City

Paving, Site Work

247

11

255

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Special Procedures, Quality Requirements, References, Definitions, Execution and Closeout Requirements, Execution, Application, Erection
Division 03 - Concrete

Division 03 - Concrete

Grouting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Postal Specialties
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
69
Bidding Soon
1,656
All Active Projects
682
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2021

August 26, 2021

img_map_placeholder

Multiple Locations, Woodstock, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.